Next Linear Collider 8 Pack RF Controls
Requirements Documents
Task List
Control System
- PV Lists:
PV Naming Convention
LLRF
Slow IOC 1 (TR07) PVs
Fast IOC (TR08) PVs
Slow IOC 2 (TR09) PVs
Slow IOC 1 (TR07) PLC PVs - sorted by PLC location
Labview CA X-Server (TR10) PVs
Summaries
PLC PV List, by name (Excel spreadsheet) 11/05/02
PLC PV List, by PLC location (Excel spreadsheet) 11/05/02
PLC Location vs DCM Location (Excel spreadsheet) 11/01/02
Cassel's Original PLC List, Jul 18, 2002
Cassel's PLC List, Sept 3, 2002
Andrew's PV List (Excel spreadsheet), Aug 21, 2002
Andrew's DIO Names List (Excel spreadsheet), updated June 10, 2003
LLRF PVs by PV Name (Excel spreadsheet), Aug 30, 2002
LLRF PVs by IQA (Excel spreadsheet), Aug 30, 2002
- Controls Working Meeting Minutes:
August 3, 2004
July 20, 2004
July 13, 2004
July 6, 2004
June 22, 2004
June 15, 2004
June 8, 2004
May 11, 2004
Apr 20, 2004
Apr 13, 2004
Apr 6, 2004
Mar 30, 2004
Mar 23, 2004
3/17/04 Latest PV -> VME Channel Assignments for Phase 2a
3/17/04 Latest Hardware Channel Assignments for Phase 2a
Mar 16, 2004
3/11/04 Latest LLRF names & channel
assignments
3/10/04 DIO channel assignments (excel spreadsheet)
3/10/04 Database Specification for Summary Display
Mar 9, 2004
3/9/04 Database Specification for Summary Display
3/3/04 New Hardware Channel Assignments for Phase 2a
Mar 2, 2004
3/2/04 Hardware Channel Assignments for Phase 2a
Feb 24, 2004
2/24/04 EPICS names list for Phase 2a
Feb 17, 2004
Feb 10, 2004
Feb 3, 2004
January 27, 2004
1/27/04 RF channel list
January 6, 2004
Dec 2, 2003
Nov 25, 2003
Nov 18, 2003
Oct 28, 2003
Sep 30, 2003
Aug 26, 2003
Aug 19, 2003
July 29, 2003
July 8, 2003
June 24, 2003
June 10, 2003
June 3, 2003
May 27, 2003
May 6, 2003
Apr 29, 2003
Apr 22, 2003
Apr 1, 2003
Mar 25, 2003
Mar 18, 2003
Mar 11, 2003 (status, no meeting)
Mar 4, 2003
Feb 18, 2003
Feb 11, 2003
Jan 28, 2003
Jan 21, 2003
Jan 14, 2003
Jan 7, 2003
Dec 17, 2002
Dec 10, 2002
Dec 4, 2002
Oct 1, 2002
Sep 3, 2002
Aug 28, 2002
Amplitude and Phase Calibration, Aug 27, 2002
Aug 20, 2002
Vacuum, Aug 19, 2002
Aug 6, 2002
Action Items, sorted by responsible person, Jul 31, 2002
Jul 30, 2002
Jul 23, 2002
Jul 16, 2002
Jul 9, 2002
Digitizer Software Requirements, Jun 18, 2002
- EPICS Displays:
db_vacp
HVPS
HVPS Diagnostic
Main
Klystron
Modulator
LLRF Main
LLRF Power Distribution Phasing
LLRF SLED Control
LLRF Ampl and Phase Control
LLRF I and Q Control
LLRF I and Q Calibration
Master boards
Slave boards
Vacuum
Vacuum Main
- 4/8-Pack Controls, Feb 22, 2002
-
8-Pack EPICS Software System Review, Feb 22, 2002
-
Controls Discussion for the 4-Pack, Jan 24, 2002
-
Notes from ESD 8-Pack Discussion, Sept 18, 2001
-
Second Pass at Controls Needs for the 8-Pack, Sept 12, 2001
Overall Description
Low Level RF
- Eight Pack Low Level RF Status and Schedule, Jul 23, 2002
- Eight Pack Low Level RF, Feb 22, 2002
- LLRF Requirements, Dec 13, 2001
- LLRF Controls, Dec 13, 2001
- LLRF Monitors, Dec 13, 2001
Special Instrumentation
Power Supply
|
EPICS at SLAC |
PEPII Controls |
NLC Dev Controls |
NLC 8 Pack Project |
| SLAC
Detailed | SLAC Home
|
Contact: Stephanie Allison