Meeting Agenda

24 Feb 2004

In attendance:  J. Nelson (notetaker), R. Chestnut, J. Frisch, R. Hall, E. Miller, J. Rock, S. Smith

 

 

Slow archiver? 
Index rebuild is imminent.  Bob will continue to work with Ian MacGregor.

 

SLED FDBK through SCP slow feedback

     Ugly Button Macro is now working.  Ed thinks he can pull this off in a slow fbck in the next few days.  Besides the delta and the updated fresh value, we want both steppers to get act->des every 10 cycles.  Slow fbck to process every minute or so.

 

SIS waveforms archived every hour (plus on change)

     We do want this and around early April.

 

List of phase 2a signals

In addition to Judy’s lovely list of 21 RF channels, we need to add 5 more ADC channels for integrated power (energy) signals with minimal accoutrement.

Steve/Joe will have a hardware list ready early this week.

Right now, the only ADC channels being used are 0 & 1 (twt5:inp:fwd and twt6:inp:fwd).  If these need to be lobotomized, please let Janice know and she/Joe can move wires around.

 

Prep for phase 2a

     Please activate in the database DTZ #3 in TR09 (need module status and 7 WFs).  The WFs also need archiving (like DTZ0-2) Thank you, Judy.

 

macnair module support of aes

Not yet.  Ron is working on this.  Database coming soonish.

Will need to be able to archive and set the gain.

Will need to have AES on structures in tunnel April 1stish

 

PLC checkout

(eventually)

 

Newplc

Rumored to be coming in a few weeks… Nice email from Alan Hill.  Janice has instructions for what to try when installed and ready to go.

 

Realm split

     This is ongoing.  Ops should expect just a few small interruptions in the future.

 

TR06 is coming…

     Up there on the roof.  Has a processor, ip address and a name.  Not booted with db, etc.

 

ELOG

     No new news.  Next, Bob, Keith, and Spence will discuss wants and work needed.

 

2-pack PLC coming in April-ish. 

~20 signals as yet undefined.

 

New Vacuum coming with phase II-a

Judy made leaping, bounding progress and is now waiting for Cassel to assign PLC channels (in March probably).

 

SIS missing pulses

This is obviously hardware.  Joe and Janice are working on it.  Maybe fixed???