ICALEPCS 2001
|
Oral Program List |
Tue Nov 27, 2001 - Regency Ballroom |
||
8:30-9:00 | Opening Session | 9:00-10:30 |
Session TUA - Status Reports |
The National Ignition Facility: Status and Plans for Laser Fusion and
High-Energy-Density Experimental Studies Edward Moses, Lawrence Livermore National Laboratory |
||
Status Report for the RHIC Control System John T. Morris, Brookhaven Laboratory |
||
Status of the SLS Control System Steven Hunt, PSI |
||
Gemini MCAO Control System Andy Foster, Observatory Sciences Limited |
||
10:30-10:50 | Refreshment Break |
Tue Nov 27, 2001 - Regency Ballroom |
10:50-12:30 |
Session TUB - Status Reports |
An Overview of the LIGO Control and Data Acquisition Systems Rolf Bork, California Institute of Technology |
||
The SLS Beamlines Data Acquisition and Control System Juraj Krempasky, Paul Scherrer Institut - Swiss Light Source |
||
Integration of the VIMOS Control System Dario Mancini, Osservatorio Astronomico di Capodimonte |
||
Overview of the NSTX Control System Paul Sichta, Princeton Plasma Physics Laboratory |
||
Report on the PCaPAC 2000 Workshop Reinhard Bacher, DESY |
||
12:30-13:45 | Lunch |
Tue Nov 27, 2001 - Regency Ballroom |
13:45-15:45 |
Session TUC - Integrating Industrial Systems in Experimental
Physics Controls, Experiment Control Systems |
Purchasing Accelerator Subsystems as Turnkey Components Steven Hunt, PSI |
||
First Experiences Integrating PC Distributed I/O Into Argonne's ATLAS
Control System Floyd Munson, ANL |
||
A Prototype of the Control System for the CMS Tracker Front-End Piero Giorgio Verdini, CERN |
||
The Control Architecture of the D0 Experiment J. Frederick Bartlett, Fermi National Accelerator Laboratory |
||
H1DCM - A New Detector Control and Monitoring System for the H1
Experiment Guenter Eckerlin, DESY |
||
15:45-16:15 | Refreshment Break |
Tue Nov 27, 2001 - Regency Ballroom |
16:15-18:00 |
Session TUD - Project Engineering and Management |
Quality Control, Testing and Deployment Results in NIF ICCS John Woodruff, Lawrence Livermore National Laboratory |
||
Management of a Large, Distributed Control System Development Project
Dave Gurd, Spallation Neutron Source |
||
Control System Design Philosophy for Effective Operations and
Maintenance Matthew Bickley, Jefferson Lab |
||
A Guerilla Approach to Control System Development Mark Plesko, J. Stefan Institute |
||
Integrated Design and Management of Complex and Fast Projects Dario Mancini, Osservatorio Astronomico di Capodimonte |
||
Wed Nov 28, 2001 - Regency Ballroom |
8:30-10:10 |
Session WEA - Evolution of a Control System, Maintenance,
Upgrading, Re-Engineering: Challenges and Design |
COSMIC - The SLAC Control System Migration Challenge Robert Sass, SLAC |
||
Re-Engineering of the GSI Control System U. Krause, GSI |
||
The Evolution of the DAFNE Control System: A History of Liberation from
Hardware Giampiero Di Pirro, INFN-LNF |
||
Upgrade of the Photon Beamline Control System on the SRS Brian Martlew, CLRC, Daresbury Laboratory |
||
Integration of a Linac Control System with New VME Controllers at
SPring-8 Takemasa Masuda, SPring-8 |
||
10:10-10:40 | Refreshment Break |
Wed Nov 28, 2001 - Regency Ballroom |
10:40-12:20 |
Session WEB - Real-Time OS, Linux in Control Systems, Emerging
Trends |
Open Source Real-Time Operating Systems Overview Till Straumann, SSRL |
||
EPICS: A Retrospective on Porting iocCore to Multiple Operating Systems
Martin Kraimer, ANL/APS |
||
L4-LINUX BASED SYSTEM AS A PLATFORM FOR EPICS IOC-CORE Jun-ichi Odagiri, High Energy Accelerator Research Organization, KEK |
||
Implementation of JFPC (Java for Process Control) Under Linux - A
Mechanism to Access Industrial I/Os in an Java/Linux-Environment Harald Kleines, Forschungszentrum Juelich |
||
12:20-13:45 | Lunch |
Wed Nov 28, 2001 - Regency Ballroom |
13:45-15:40 |
Session WEC - Closed Loop and Feedback Systems |
Orbit feedback using X-ray beam position monitoring at the Advanced
Photon Source Glenn Decker, Advanced Photon Source |
||
The Wavefront Control System for the National Ignition Facility Lewis Van Atta, Lawrence Livermore National Laboratory |
||
Readout and Control of a Power-Recycled Interferometric Gravitational
Wave Antenna Daniel Sigg, LIGO Hanford Observatory |
||
A Distributed Feedback System for Rapid Stabilization of Arbitrary
Process Variables Brian Bevins, Jefferson Lab |
||
Active Vibration Suppression R&D for the NLC Josef Frisch, SLAC |
||
Beam Feedback Systems and BPM Read-Out System for the Two-Bunch
Acceleration at KEKB Linac Kazuro Furukawa, High Energy Accelerator Research Organization (KEK) |
||
15:40-16:10 | Refreshment Break |
Wed Nov 28, 2001 - Regency Ballroom |
16:10-18:00 |
Session WED - Configuration and Databases |
Decision Support Facility for the APS Control System Donald Dohan, Argonne National Laboratory |
||
The KLOE/DAPHNE Status Logging, Analysis and Database System G. Mazzitelli, LNF-INFN |
||
Introducing I/O Channels into the Device Database Opens New
Potentialities for Configuration Management Thomas Birke, BESSY |
||
Configuration and Database for the Control System of the VISIR
Instrument Jean-Francois Gournay, CEA Saclay |
||
Front-End Electronics Configuration System for CMS Philippe Gras, CERN |
||
BaBar on-line Object Oriented databases Andrei Salnikov, SLAC |
||
Thu Nov 29, 2001 - Regency Ballroom |
8:30-10:10 |
Session THA - Distributed Computing Software |
Large-Scale CORBA-Distributed Software Framework for NIF Controls Robert Carey, Lawrence Livermore National Laboratory |
||
On the Use of CORBA in High Level Software Applications at the SLS Jan Chrin, Paul Scherrer Institute |
||
Preliminary Design of MUSES Control System Based on RT-CORBA and
Java Toshiya Tanabe, RIKEN |
||
Distributed Control System for the Test Interferometer of the Atacama
Large Millimeter Array Project Martin Pokorny, National Radio Astronomy Observatory |
||
Common Software for the ALMA project Gianluca Chiozzi, European Southern Observatory |
||
10:10-10:35 | Refreshment Break |
Thu Nov 29, 2001 - Regency Ballroom |
10:35-12:15 |
Session THB - Innovative Special Solutions |
Development of a Detector Control System for the ATLAS Pixel
Detector Susanne Kersten, University of Wuppertal |
||
The CDF-II Online Silicon Vertex Tracker Simone Donati, INFN - Pisa |
||
The All-Digital Approach to LHC Power Converter Current Control Quentin King, CERN |
||
An EPICS to TINE Translator Zoltan Kakucs, DESY |
||
12:15-13:35 | Lunch |
Thu Nov 29, 2001 - Regency Ballroom |
13:35-15:15 |
Session THC - Enabling and Emerging SW Technologies: OO
Technologies, Java, XML, Real-Time OS, Development Methods and
Tools |
The Object Oriented Approach to Machine Physics Calculations with Java
Technology Mark Plesko, Josef Stefan Institute, Ljubljana, Slovenia |
||
A Framework for Java Application Programs in the CERN PS Control
System Jan Cuperus, CERN |
||
Application Software Structures Enable NIF Operations Kirby Fong, Lawrence Livermore National Laboratory |
||
The Control System Modeling Language Klemen Zagar, J. Stefan Institute |
||
An XML Driven Graphical User Interface and Application Management
Toolkit Matthias Clausen, DESY |
||
15:30-16:00 | Refreshment Break |
Thu Nov 29, 2001 - Regency Ballroom |
15:45-17:30 |
Session THD - Networking, Fieldbusses |
Emerging Trends in Networking Andy Bechtolsheim, Cisco Systems |
||
Interfacing the ControlLogix PLC Over EtherNet/IP Kay-Uwe Kasemir, Los Alamos National Laboratory |
||
National Ignition Facility (NIF) Control Network Design and Analysis
Robert Bryant, Lawrence Livermore National Laboratory |
||
Toward a Reliable Gigabit Network - An Upgrade of the SPring-8
Network Toru Fukui, SPring-8 |
||
Fri Nov 30, 2001 - Regency Ballroom |
8:30-10:10 |
Session FRA - Beam Diagnostics and Timing Systems |
SNS Timing System Brian Oerter, Brookhaven National Laboratory |
||
Beam Diagnostics Systems for the National Ignition Facility Robert D. Demaret, Lawrence Livermore National Laboratory |
||
Multi-Channel Distributed System for Beam Diagnostic of Race-Track
Microtron Alexander Chepurnov, Institute for Nuclear Physics of Moscow State University |
||
Timing System of the Swiss Light Source Timo Korhonen, PSI/SLS |
||
Performance of the 508MHz Reference and Timing Systems at SPring-8 Yuji Ohashi, SPring-8 |
||
10:10-10:35 | Refreshment Break |
Fri Nov 30, 2001 - Regency Ballroom |
10:35-12:30 |
Session FRB - Operation, Commissioning, and Process Tuning,
Remote Op eration and Participation |
How to Commission, Operate and Maintain a Large Future Accelerator
Complex from Far Remote Sites Ferdinand Willeke, DESY |
||
System Integration of High Level Applications during the Commissioning
of the Swiss Light Source Andreas Luedeke, PSI |
||
The Bunch Injection Controller for the PEP-II Storage Rings Ronald Chestnut, SLAC |
||
Model Driven Ramp Control at RHIC Johannes van Zeijts, BNL |
||
Signal Archiving and Retrieval: Essential Long Term Performance Tuning
Tool Roland Mueller, BESSY |
||
12:30-13:30 | Lunch |
Fri Nov 30, 2001 - Regency Ballroom |
13:30-16:00 |
Session FRC - Summary and Closing Address |
Closing Talk R. Humphrey, SLAC |
SLAC | ICALEPCS 2001 |
ICALEPCS 2001 |