Upgrading Building Switches
Les Cottrell, created 8/22/08
The procedure for upgrading each building switch is:
- For the switch to be upgraded, net-eng
provides a
table of admin, hostname, ipaddress, macaddress, username, hosttype,
building, room, tap, time host last seen.
There is an example of a table
here+.
There are instructions (for net-eng) to
create the list.
- The table is sent as email to each admin for the switch. An example
of the email is shown here.
- Net-eng
creates
and configures the new subnets on the switch
- OU admins obtain new addresses for all the hosts involved
- OU admins work with users on re-addressing hosts one at a time.
Net-eng will be involved to change VLAN when a host is readdressed.
- During this time, the switch has no redundant uplinks, because
one uplink is used for the old subnets, one for the new ones.
- Therefore we need to keep the re-addressing time as short as possible!
(make sure resources are available etc).
- net-eng clears the old subnets from the switch and enables redundant
uplink