20040113
Scan with HV=-2.3kV: 20040119
Scan with HV=-2.2kV: 20040123
MCP scan with HV=-2.4kV and threshold=100mV: 20030919
All scans after Sep 19, 2003 run with 100mV discriminator threshold.
MCP Scan at 430nm with HV=-2.4kV, threshold=85mV: 20030913
MCP Scan at HV=-2.4kV, threshold=85mV: 20030819
Scan to confirm that amplifier channels are all working again.
MCP Scan at HV=-2.4kV, threshold=85mV: 20030813
MCP Scan at HV=-2.4kV, threshold=50mV: 20030807
MCP Scan at HV=-2.4kV, threshold=65mV: 20030801
MCP Scan at HV=-2.1kV, threshold=85mV: 20030728
MCP Scan at HV=-2.2kV, threshold=85mV: 20030724
MCP Scan at HV=-2.3kV, threshold=85mV: 20030720
MCP Scan at HV=-2.4kV, threshold=85mV: 20030712
Last significant update: February 27, 2004, | by Joe |