Aetron Blume and Atkinson Reports, 1961-1966
Early studies leading up to and supporting the April 18,
1957 formal proposal for a two-mile accelerator at Stanford
University were performed by a Project M study group on
campus, by the Utah Construction company, the Bechtel
Corporation, and the University of California Radiation
laboratory (later the Lawrence Radiation Laboratory.) The
joint venture Aetron-Blume-Atkinson (ABA) – comprised of
people from the Aetron Division of Aerojet-General
Corporation; John A. Blume and Associates, Engineers; and
the Guy F. Atkinson Construction Company – also completed
studies related to the proposed project.
The following is a list of ABA numbered reports relating
to the development of the SLAC proposal and known to the
SLAC Archives and History Office. Links are provided to
digitized copies of all ABA reports held by the SLAC
Archives.
Note: Most links on this page open pdf
files, which require the free Acrobat
Reader.
- Report on the Proposed Stanford Two-Mile Linear
Electron Accelerator at Sand Hill Site. Including: Site
Feasibility, Earthquake Risk, Cost Estimates. Volume IV.
Prepared for The United States Atomic Energy Commission
San Francisco Operations office by John A. Blume &
Associates, Engineers, San Francisco, California.
December 1960.
-
Part 1 (frontmatter through page XX-2, Includes
Table of Contents)
-
Part 2 (pages XX-3 to XXI-12)
-
Part 3 (pages XXI-13 to XXII-7 )
-
Part 4 (pages XXII-8 to XXII-19, and drawings )
-
Part 5 (continues drawings, pages XXIII-1 to
XXIII-10, and drawings)
-
Part 6 (continues drawings, pages XXIV-1 to
XXIV-4, Appendix P, part 1)
-
Part 7 (Appendix P, part 2, Appendix A, part 1)
-
Part 8 (Appendix A, part 2)
-
Part 9 (Appendix A, part 3)
-
Part 10 (Appendix A, part 4, Appencices Q-V)
- Stanford Linear Accelerator Center
Construction Completion Report. Compiled by U.S. Atomic Energy Commission,
San Francisco Operations Office (Palo Alto Area), 1970. Includes content (descriptions, schedules, figures,
drawings) drawn from ABA reports, as well as photographs of buildings.
- ABA Numbered Reports:
- ABA 1 May, 1961. Skjei. Investigations of
Benchmark Elevation Changes in Sand Hill Area,
- ABA 2 May, 1961 Sharpe Monthly Progress Report
for Period 4/1/1961 - 4/30/1961
- ABA 3 June, 1961 Dyer Heat Transfer Systems
Study
- ABA 4 May, 1961 Liik Project Facilities, Factors
to be Considered in Development of Fire Protection
and Prevention Criteria
- ABA 5 August, 1961 Krouse Accelerator Tube
Demineralized Water System Instrumentation and
Control Study
- ABA 6 July-August, 1961 Niedhamer Fuels,
Boilers, and Waste Heat Utilization Studies (Ammendum
A)
- ABA 7 July, 1961 Niedhamer Air Conditioning Data
and Practices for the Palo Alto Area
- ABA 8 June, 1961 Krouse Test Laboratory Hydrogen
Detection System Proposal
- ABA 9 June, 1961 Sharpe Monthly Progress Report
for Period 5/1/1961 - 5/31/1961
- ABA 10 August, 1961 Dyer Schematic Design - Test
Laboratory Area Mechanical Heat Transfer and Fire
Protection (Revision 3)
- ABA 11 August, 1961 Dyer Outline Specification -
Test Laboratory Heat Transfer Systems (Revision 2)
- ABA 12 June, 1961 Krouse Facility Fire Detection
System Criteria
- ABA 13 July, 1961 Krouse Automatic and Manual -
T Water Controls for Klystron Test Cells
- ABA 14 July - August, 1961 Swanson/ Biebesheimer
Project M Telephone System (Revised August, 1961)
- ABA 15 August, 1961 Liik Report of
Accomplishments Subcontract S-128 6/30/1961
- ABA 16 July, 1961 Krouse General Specifications,
Test Laboratory Utility Instrumentation
- ABA 17 cancelled Krouse Outline Specifications,
Site Development Utility Instrumentation
- ABA 18 September, 1961 Mauer/ Krouse Public
Adress System, Project M, Proposed Design Criteria
- ABA 19 March, 1962 Hansen/ Buhrig
Intercommunication System, Project M, Proposed
Design Criteria
- ABA 20 August, 1961 Smothers A Preliminary
Analysis of System Coordination Related to Circuit
Protection and Feeder Size
- ABA 21 July, 1961 Gilbert A Study of the Use of
Pile Supports for the Accelerator Pipes
- ABA 22 August, 1961 Sharpe Monthly Progress
Report for Period 7/1/1961 - 7/31/1961
- ABA 23 August, 1961 Niedhamer Refrigeration
Systems for Air Conditioning
- ABA 24 October, 1961 Smothers AC Power Systems
Cost Study 1997-020
- ABA 25 October, 1961 Niedhamer Humidity in
Accelerator Housing 1997-020
- ABA 26 October, 1961 Sharpe Monthly Progress
Report for Period 8/1/1961 - 9/30/1961
- ABA 27 October, 1961 Gilbert Interim Report: the
Use of Heavy Aggregates as Radiation Shielding Fill
for the Stanford Linear Accelerator
- ABA 28 October, 1961 Liik Project M Facilities
Design, Health and Safety Considerations
- ABA 29 November, 1961 Sharpe Monthly Progress
Report for Period 10/1/1961 - 10/31/1961
- ABA 30 November, 1961 Keith/ Logan Title I
Report, Initial Site Improvements FY 1962 for
Project M Site
- ABA 31 December, 1961 Tabor Preliminary
Geological Report on the Two-Mile Stanford Linear
Electron Accelerator
- ABA 32 March, 1962 Dirth Title I Report on
Administration Engineering Building.
- ABA 33 January, 1962 Liik Title I Report on
Utility Building A and Heat Transfer Systems,
Laboratory Area, Rev. 2. Rev. 3
- ABA 34 December, 1961 Gilbert Estimated
Construction Cost of Accelerator Housing with
Various Inside Dimensions
- ABA 35 December, 1961 Keith report of
Preliminary Trials of Optical Alignment
- ABA 36 January, 1962 Sharpe Monthly Progress
Reprt for Period 11/1/1961 - 1/15/1962
- ABA 37 February, 1962 Smothers Master Substation
Design Plan
- ABA 38 February, 1962 Gilbert Study of Alternate
Methods of Construction of the Accelerator Housing
- ABA 39 March, 1962 Keith Study on Water Supply
Alternates for SLAC. (Revised May, 1962)
- ABA 40 March, 1962 Keith/ Dirth Site Utilities
Distribution, Title I
- ABA 41 March, 1962 Skjei Progress Report on
Ground Movement Investigations
- ABA 42 March, 1962 Merrick Design Criteria
Report: Foundation Grading and Cross Drainage for
the Accelerator Housing
- ABA 43 July, 1962 Liik Title I Report on
Construction Office Building
- ABA 44 April, 1962 Liik Title I Report on
Electronics and StoresBuilding and Fabrication
Building
- ABA 45 May, 1962 Merrick Design Criteria Report,
Accelerator Housing Project
- ABA 46 June, 1962 Keith Title I Report for
Foundation Grading and Cross Drainage for
Accelerator Housing Station (2+25 to 30+50)
- ABA 47 June, 1962 Biebesheimer Title I Report on
Electrical Site Utilities Distribution
- ABA 48 August, 1962 Harris Design Criteria
Report for Klystron Gallery
- ABA 49 July, 1962 Brittain Earth Movement
Surveys
- ABA 50 August, 1962 Biebesheimer Study of Sewage
Alternates at SLAC
- ABA 51 August, 1962 Swanson/ Biebesheimer Study
on 220kv Substation for SLAC
- ABA 52 August, 1962 Brittain Horizontal Movement
Surveys
- ABA 53 August, 1962 Harris Design Report for
Accelerator Housing Accessways
- ABA 54 August, 1962 Leys Title I Report on
Central Laboratory
- ABA 55 December, 1961 Leys Title I Report on
Heavy Assembly Building
- ABA 56 September, 1962 Biebesheimer/ Paroulek
Title I Report for SLAC Administrative Telephone
System
- ABA 57 October, 1962 Harris Title I Report on
Accelerator Housing and Earthwork
- ABA 58 January, 1963 Harris Title I Report on
Klystron Gallery and Associated Utilities and Site
Improvement
- ABA 59 October, 1962 Liik Design Criteria Report
for Control Building
- ABA 60 November, 1962 Tabor Interim Geological
Report on Two-Mile Linear Electron Accelerator Site,
San Mateo County, California
- ABA 61 April, 1963 Biesbeheimer Title I Report
for the 220kv Master Substitution
- ABA 62 January, 1963 Gilbert/ Keith Report on
the Use of Piles for Support of the Accelerator Tube
- ABA 63 January, 1963 Keith Preliminary Report on
Rate of Change Curvature along the Accelerator
Alignment
- ABA 64 December, 1962 Skjei/ Brittain
Accelerator Foundation Movement Observation and
Control Room
- ABA 65 January, 1963 Keith Analysis of
Accelerator Housing Movement Tolerances
- ABA 66 February, 1963 Brittain Design of the
Accelerator Service Shafts
- ABA 67 January, 1963 Brittain Earth Movement
Surveys for SLAC
- ABA 68 February, 1963 Keith Considerations in
Design of Accelerator Housing
- ABA 69 March, 1963 Biebesheimer Title I Report
for Loop Road and Associated Site Improvements
- ABA 70 February, 1963 Biebesheimer Water Line
Study
- ABA 71 March, 1963 Niedhamer Tempurature
Insulation Requirements
- ABA 72 April, 1963 Biebesheimer Title I Draft -
Landscaping
- ABA 73 April, 1963 Liik Title I Report on
Control Building - Draft
- ABA 74 April, 1963 Edwards/ Liik/ Gilbert
Preliminary Report of Considerations in Design for
Beam Switchyard (Revised May, 1963)
- ABA 75 June, 1963 Liik Title I Report for
Chemical Cleaning Area, Fabrication Building. Rev.1
- ABA 76 July, 1963 Liik Design Criteria Report
for Beam Switchyard
- ABA 77 July, 1963 Edwards Design Criteria Report
for Cafeteria/ Auditorium/ Shops Dining Room
- ABA 78 June, 1963 Harris Economic Comparison of
On-Site Versus Off-Site Concrete Plant
- ABA 79 July, 1963 Keith Occurrence of Cracking
in Concrete Buildings
- ABA 80 July, 1963 Brittain Progress Report on
Earth Movement
- ABA 81 September, 1963 Liik Materials Handling
System in Beam Switchyard
- ABA 82 October, 1963 Keith/ Harris Review of
Surface Coating for Accelerator Housing
- ABA 83 December, 1963 Leys Design Criteria
Report for End Station A
- ABA 84 December, 1963 Harris Design Criteria
Report for End Station B
- ABA 85 December, 1963 Liik Title I Draft for
Beam Switchyard
- ABA 86 January, 1964 Edwards/ Swanson/
Biebesheimer Design Criteria Report for Target Area
Site Improvements and Utilities
- ABA 87 February, 1964 Leys Title I Draft Report
for Auditorium/ Cafeteria/ Shops Dining Room
- ABA 88 March, 1965 Skjei/ Tabor/ Conwell/ Danehy
Geologic Site Investigation of the Stanford Linear
Accelerator Center - Summary Report
- ABA 89 February, 1964 Niedhamer Heating End
Stations A and B
- ABA 90 July, 1963 Osgood Preliminary Concrete
Design Studies for the Initial Accelerator Housing
- ABA 91 April, 1964 Leys Title I Report on End
Station A
- ABA 92 May, 1964 Harris Title I Report on End
Station B
- ABA 93 February, 1964 Swanson/ Niedhamer Beam
Switchyard Ventilation Study
- ABA 94 March, 1964 Rulofson/ Niedhamer Design
Evaluation Report on Piping Materials for the Low
Conductivity Water System in the Target Area
- ABA 95 June, 1964 Biebesheimer Title I Report -
Area Lighting
- ABA 96 July, 1964 Boyle/ Keith Progress Report
on the Use of Low-Shrink Concrete, Epoxy Injection
Filling of Concrete Cracks and Boron Additive
Concrete in Accelerator Housing
- ABA 97 July, 1964 Osgood Investigations of the
Effect of Boron Admixture on Concrete Properties. Final version
- ABA 98 (draft) August, 1964 Leys Title Report -
Cryogenics Facility Revised
- ABA 99 August, 1964 Smith Procurement of Cooling
Towers
- ABA 100 September, 1964 Smith Procurement of
Unit Substations
- ABA 101 August, 1964 Crocker Second Story
Addition to One Story Wing - Central Laboratory
- ABA 102 March, 1965 Brittain Progress Report on
Earth Movement Survey
- ABA 103 April - June, 1965 Osgood Investigation
of Coarse Aggreagate from the Tunnel Rock Quarry
Supplement
- ABA 104 September, 1965 Niedhamer/ Naughten
Design, Installation and Testing of the Klystron
Gallery Cooling Tower Water Lines
- ABA 105 September, 1965 Hyde Title I Report for
Data Assembly Building Addition
- ABA 106 May, 1966 Brittain/ Boyle Earth Movement
Investigations and Geodetic Control for SLAC
- ABA 107 September, 1966 Sharpe Engineering
Design Summary Report
- ABA-MS5 Section- Air-Conditioning,
Heating and Ventilating Systems
Please Note: ABA reports written and submitted after the
firm was selected to provide architect engineer-management
services for the construction of SLAC (1962-1971), are part
of the SLAC numbered reports series, and can be found online
in full text the
inSPIRE database.