PIOP Messages 1) Modules Required : a) PIOP (123-624) b) PIOP Datalink Tester (233-901-01) c) PIOP Test Box Switch Box (233-900-01) d) PDU (233-002) e) STB (233-001) 2) Nothing can be Connected to J1 on the PIOP (CAMAC Connector) when doing tests on the PIOP CAMAC Test Menu. 3) Cable Connections when doing tests requiring the Datalink Tester and Test Box Switch Box : a) Connect J1 on the Datalink Tester to J1 on the PIOP. b) Connect J2 on the Datalink Tester to J1 on the Test Box Switch Box. c) Connect the CH0 Trigger Output on the STB to CH4 on the Scope" as a Scope Sync. [Must be Terminated in 50ê] d) Connect `TRIG' on the Datalink Tester to CH1 on the Scope. [Must be Terminated in 50ê] e) Connect` CLOCK' on the Datalink Tester to CH2 on the Scope. [Must be Terminated in 50ê] 3) Check Resistance of all Resistor Packs to Insure that Correct Components were Installed. a) RP2 and RP3 should be 8 pin, 4 Resistor SIPs. You should measure 100 ohms between pins (1 and 2), (3 and 4), (5 and 6) and (7 and 8). a) RP1, RP4 and RP5 should be 10 pin, 9 Tesistor SIPs. Pin 1 is positioned either toward the Top of the Module or toward the Front of the Module. You should measure 5.1K ohms between pin 1 (OR +5 volts) and pins 2, 3, 4, 5, 6, 7, 8, 9 and 10 with one Exception. c) The Exception: You should measure about 225 ohms between RP4-1 (OR +5 volts) and RP4-3.