1. Per Franz-Josef Decker, remove references to OTR22, which has been removed from Sector 25 for XLEAP: OTRS_LI25_342_OUT_LMTSW OTRS_LI25_342_IN_LMTSW OTR22 Position OTR22 Position When TDUND Not In See Email_F_J_Decker_OTR22_Removal_10May2017.txt 2. Per Alex Wallace, updates to FEE as part of 2017 FEE Reconfiguration. Details in: FEE6MDMPSChanges_LN38_A_Wallace_11May2017.xlsx FEEMPSLogicChangeRequestsPost6MD_A_Wallace_11May2017.docx 2a. FEE Camera 852 Position changed from individual IN/OUT LN Inputs to single status from FEE PLC. FEE Camera 852 Position replaced with new FEE Camera 852 Position - Status From PLC 2b. FEE Camera 913 Position changed from individual IN/OUT LN Inputs to single status from FEE PLC. FEE Camera 913 Position replaced with new FEE Camera 913 Position - Status From PLC 2c. All solid attenuator IN/OUT limit switch inputs removed. Associated logic now performed in FEE PLC. 2d. NEH1 XTOD H Isolation Valve Summary replaced with new NEH1 HXTD Vacuum Valve Summary 2e. FEE Fast Shutter Valve and System Summary and FEE Instrument Vacuum Isolation Valve Summary and FEE XTOD H Isolation Valve Summary replaced with new FEE HXTD Vacuum Valve Summary 2f. FEE Solid Attenuators - Gas Pressure Interlock and FEE Gas Flow Aperture Summary and FEE Gas Flow Vacuum Isolation Vale Summary replaced with new FEE Gas System Summary