Llrf4-R1-0-0 Initial release for the Pattern Aware LLRF. Llrf4-R1-1-0 Separate out the PAU for the laser feedback M iocBoot/ioc-in20-rf01/st-prod.cmd M llrf4App/Db/llrfIN20.pau_substitutions (remark) new PAU (namely pau1) is for the laser lopp The pau0 is for other else. pau0 and pau1 will send PAC command packets indepandentaly. we don't want this, so we need more effort for this issue. Fix mis configured parameter in scale factor record for the L1X reference amplitude. M llrf4App/Db/llrf.l1x_template Llrf4-R1-1-1 Bug fix on the slow update PV for amplitude and power in TCAV3 Those PVs has been mis-configured. Amplitude PV displays the power, and power PV displays the amplitude M llrf4App/Db/llrf.tc3_template Llrf4-R1-2-0 Put FCOM interface for the communication between FF controller and RF master IOCs. Incearse scan rate to 10Hz for the followings PVs to improve the speed of "Phase Scan GUI". GUN: GUN:IN20:1:GN1_0_S_PA GUN:IN20:1:GN1_1_S_PA GUN:IN20:1:GN1_2_S_PA GUN:IN20:1:GN1_3_S_PA L0A: ACCL:IN20:300:L0A_0_S_PA ACCL:IN20:300:L0A_1_S_PA L0B: ACCL:IN20:400:L0B_2_S_PA ACCL:IN20:400:L0B_3_S_PA L1S: ACCL:LI21:1:L1S_0_S_PA ACCL:LI21:1:L1S_1_S_PA ACCL:LI21:1:L1S_2_S_PA ACCL:LI21:1:L1S_3_S_PA L1X: ACCL:LI21:180:L1X_0_S_PA ACCL:LI21:180:L1X_1_S_PA L3: ACCL:LI29:0:KLY_S_PSET ACCL:LI30:0:KLY_S_PSET Add up Makefiles in iocBoot area to build envPaths file. Llrf4-R1-2-1 Rebuild with fcomUtil-R1-0-0, pau-R0-1-7 Llrf4-R1-2-2 Include iocRelease.db in the new iodAdmin Llrf4-R1-2-3 Rebuild with pau-R0-1-8 Llrf4-R1-2-4 Rebuild with pau-R0-1-9 Put backwared propagation for MUX: L0A, L1B, L1S and L1X. Llrf4-R1-2-5 Rebuild with pau-R1-1-0 Put new iocAdmin acess PV for L2 reference and 24-1 ampltiude, 24-2, 24-3, s29, and s30 Make releation between the iocAdmin access PVs and Mux control PVs. Llrf4-R1-2-6 Migrate L2 reference PAC from ioc-in20-rf01 to ioc-li24-rf01 Llrf4-R1-2-7 Add up calculations for the KLY24-5 Llrf4-R1-3-0 Implement L2/L3 abstraction layer Push down record calucations for 24-1, 24-2, 24-3, L2Ref, S29 and S30 into mux layer (REMARK) L2/L3 abstractiion is not finished yet. We need some more test and two or three minor upgrade required to finish it. Llrf4-R1-3-1 L2/L3 abstraction layer test stage (not-official release) phase-I and phase-II Llrf4-R1-3-2 L2/L3 abstraction layer test stage (non-official release) phase-II verification Clean up the configuration part in the start up script for the L2/L3 abstraction Muxes Add up dbpf(.PROC, "1") for S29 POC and S30 POC. Llrf4-R1-3-3 L2/L3 abstraction layer test stage (non-official release) phase-III Llrf4-R1-3-4 Fix the transient behavior on the L2/L3 abstraction layer during the reboot Llrf4-R1-4-0 To support fcomUtil-R1-1-1: rename the FCOM PV name for l2/l3 abstraction layer To Support pau-R1-4-0: to avoid glitch when turn on the feedback mode Llrf4-R1-4-1 Fix BSA for the laser amplitude Fix BSA for the L1X Llrf4-R1-5-0 swtich 21-1 PAD to a udpComm PAD add BSA for the 20-1 PAD