LCLS Controls
LLRF Final Design Review
September 19th, 2006, 9 am to 12pm, 1pm - 3 pm Redwood A/B, Research Office Building (ROB) (Building #48)
Material that is reference by the review material
- PAC hardware data description Jeff Olsen
- PAC software specification Ron Akre
Review Material
- LCLS LLRF Distribution Ron Akre
- LLRF Control Design Specification (.doc) Dayle Kotturi/Ron Akre
- LLRF Control Design Specification (.pdf) Dayle Kotturi/Ron Akre
Review Presentation
- LCLS LLRF Review Sept 2006.ppt Ron Akre
- LCLS LLRF Review Sept 2006.pdf Ron Akre
Design Review Committee:
Bob Dalesio (chair) Larry Doolittle Joe Frisch Keith Jobe Patrick Krejcik Charge to the Committee:
The reviewers will be given the LCLS LLRF performance requirements, and are asked to critically assess the proposed designs for LCLS operation requirements. The committee is requested to:
- Follow the final design review criteria at: Components subject to Final Design Review Criteria
- Review the following components:
- RF Distribution Reference System for Injector Commissioning
- RF System for Injector Commissioning
- PAD
- PAC
- VME
- Consider these specific goals of this FDR:
- Injector turn on is January 3, 2007. The designs of the prototype PADs and PACs have been built and tested. Fabrication is scheduled for October, 2006. Please review analysis of test data and the proposed design and comment on the proposed systems' ability to meet LCLS specifications.
- Review our test plans and suggest improvements
Agenda
9 am to 12 pm:12 pm to 1 pm:
- RF Distribution Reference System for Injector Commissioning
- RF System for Injector Commissioning
1 pm to 3 pm:
- Lunch
3 pm to 4 pm:
- RF System for Injector Commissioning cont'd
- RF Local Feedback Modelling Results (Rivetta)
- Committee discussion - closed
Committee's Report
- LLRF FDR Report