The LCLS Controls Group has requirements for network
access, during the construction of the LCLS, and for the Accelerator itself
once operational (the production, or operations network.)
Requirements are organized as Functional, Non-functional,
Schedule and Cost. Functional requirements specify what the network must do;
non-functional requirements specify qualities that the network must have. Capacity, bandwidth and speed are
examples of non-functional requirements.
Schedule and Cost requirements are estimates based on current
information, and in many cases are yet to be determined.
Functional Requirements
1.
The SCCS Group at SLAC shall be responsible for the design
details and installation of the physical LCLS network as specified in this
document. All design and
installation details shall be reviewed by the LCLS
Controls Group regularly as work proceeds.
2.
The LCLS network shall support four conceptual subnets, each
having distinct requirements. They are referred to as Development, Test,
Access Control and Operations.
3.
Development subnet;
the LCLS network shall support a Development subnet for engineering and testing
of components to be used in the LCLS accelerator.
1.
The development subnet shall isolate development activities
from other SLAC network activity, while providing full
access to other computers on the SLAC network..
2.
Activity on the LCLS development network shall not interfere
with normal activities on the rest of the SLAC network.
3.
The development subnet shall be accessible to offices in
Building 280A, where the LCLS Controls Group currently reside, but also to
a few specific Lab areas within SLAC, to be determined as work proceeds.
4.
The development subnet shall be accessible to desktop
computers, laptop computers and single-board computers used by the LCLS
Controls Group.
1.
The LCLS Controls Group shall be able to do
day-to-day work on their desktop computers. Specifically, they shall have full
access to resources on the SLAC network, and the Internet in general, from
specific desktop or laptop computers residing on the development subnet,
subject to the network policies in place at SLAC.
2.
Desktop and laptop computers shall be assigned DHCP or static
IP addresses, as per standard SLAC policy.
3.
The LCLS Controls Group shall have the ability to add
any reasonable number of single board computers to the development subnet. These computers shall not be directly
accessible from the Internet, nor shall they be able to access anything outside
the SLAC network. They are
considered to be in an Internet-Free Zone.
4.
Single board computers on the development subnet shall be
assigned static IP addresses, according to standard SLAC policy.
5.
The development subnet shall contain a development server,
which is accessible from all desktop, laptop and single board computers on that
development subnet.
1.
The development server shall be physically accessible to
members of the LCLS Controls Group, currently those located in
Building 280A.
2.
Certain specific individuals shall have administrative (root)
privilege on the development server, either as a root password or through a
"sudo all" capability.
3.
The development server shall be accessible from Internet
through a secure channel. It is
not required to be directly accessible from the Internet; it may be accessed
indirectly via an intermediate login host.
4.
The development server shall provide TFTP-based file transfers.
TFTP service shall only be made available to IOCs on the development
subnet. TFTP service shall not be
visible outside of the development subnet.
5.
The development server shall provide NFS mounted directories
as an NFS server, only to IOCs on the development subnet. The NFS mount service need not be
visible outside the development subnet.
6.
The development server shall provide full access to AFS.
7.
The development server shall provide access to all
development tools, including compilers, debuggers, version control and other
software deemed necessary by the LCLS
Controls Group.
8.
The development server shall have the ability to provide
Web-based access to data or applications.
Access to these web-based pages need only be provided to the development
subnet.
9.
The SCCS Group shall specify a backup strategy for the
development server.
4.
Testing subnet; the
LCLS network shall support a separate conceptual Testing subnet, on which LCLS
Controls engineers can deploy test equipment intended for primary accelerator
operations.
1.
The test subnet shall isolate any and all anomalous network
activity to that subnet.
2.
Network test equipment shall reside on this subnet to
accommodate testing.
3.
The Testing subnet is not required to have direct access to the
Internet or other SLAC public networks.
1.
The Testing subnet shall be accessible from, and have access
to, the Development network.
4.
The testing subnet shall provide a set of predefined IP
addresses that can be temporarily assigned to network-enabled devices. As a footnote, it is important that an
effective policy be implemented to manage the allocation and usage of these
temporary addresses.
5. Access
Control subnet; often referred to as the DMZ subnet,
shall provide the only mechanism to access the operations network. The operations network is described
under requirement 6
below.
1.
Only those devices in the Access Control subnet shall have
access to the Operations network.
2.
There shall be an SSH Server on the Access Control subnet,
which provides the only means by which an individual outside of the control
room or accelerator halls can gain login access to the Operations network.
1.
A subset of SLAC User IDs shall be recognized and enabled by
the SSH server, to allow remote login to the Operations network.
3.
There shall be a Web server located on the Access Control
subnet, which shall provide open web-based access to most of the measured data
being cached from the Operations network.
1.
The Web pages from this server shall not be accessible outside
of SLAC.
1.
The EPICS Gateway server shall recognize a subset of SLAC User
IDs from specific hosts and provide them remote programmatic access to the
Operations network.
2.
Only software running under an authenticated User ID shall be
allowed control system access through the EPICS Gateway server.
5.
There shall be offline data servers available on the Access
Control subnet. The majority of
programmatic access to the control system data shall access that data on this
server. Specifically, this server
shall maintain a regularly updated cache of accelerator controls data.
6. Operations
network; the LCLS network shall support a separate dedicated network for the
commissioning and operation of the LCLS accelerator.
1.
The operations network shall be completely self-contained.
Specifically, it shall be able to perform all control system functions and
provide all services without a physical connection to any other network.
2.
The operations network shall provide redundant network
switching and connectivity support. For example, certain key pieces of network
equipment shall be duplicated such that a failure of one key component will
cause a second to come into effect.
3.
The operations network shall be populated by network devices
having IP addresses in the Class A reserved space of 10.X.X.X.
1.
The SCCS Group shall provide the specific network range in
which the IP addresses shall reside.
Specifically, the second number in the dotted decimal notation shall be
provided by the SCCS Group, effectively specifying a Class B range of
addresses. For example, operations
network IP addresses may be specified by the SCCS Group to be in the range of
10.10.0.X to 10.10.255.X. This
specific address range is our preference.
2. The
third and fourth set of numbers in the dotted decimal notation shall be
assigned by the LCLS Controls Group.
The third set of addresses shall refer to subnets having related
functionality or geography. For example, 10.101.20.X
might refer to the Injection line components, and 10.101.32.X
might refer to LTU components.
3.
The SCCS Group has the option of specifying an address
allocation strategy beyond what is described here. For instance, there could be a policy to reserve IP
addresses in a certain range for network diagnostic equipment, switches or
routers.
4.
All MAC addresses and IP addresses in use within the
operations network shall be recorded and made available to the SCCS Group. Ideally, this will allow easy
identification of misbehaving network or computer equipment, or unwanted
interaction of network equipment with elements outside the network.
4. Physical
Layout; the operations network shall be centered in the Main Control Center
(MCC) and connect all areas of the LCLS accelerator facility.
The
diagram in Figure 1
is meant to represent the LCLS accelerator facility, and the labeled,
highlighted rectangles indicate where Operations network access is
required. Those locations will
house the IOCs and related instrumentation. Refer to requirements in Section 6.5.
Figure
1. LCLS Accelerator
Areas and Anticipated IOC Locations.
The
prefix 'B' refers to existing SLAC Buildings, except those numbered above 900
which represent planned construction with tentative names.
1.
All operations network nodes shall have the ability to communicate
with any other node on the operations network.
2.
Each IOC shall have its primary ethernet connection on a
specific subnet.
3.
Certain dual-homed IOCs shall have their secondary ethernet
connection on a different subnet from their primary one, but on the same
operations network. For example,
the following 2 IOCs have primary connections to different subnets, but they
are both on a dedicated subnet (VLan) for Fast Feedback. In practice, there could be any number
of IOCs having their primary or secondary ethernet ports (but not both)
connected to a Fast Feedback dedicated VLan.
Figure 2. Multi-homed IOCs with a
Dedicated Connection
4.
Each area of the LCLS Accelerator having one or more IOCs
shall also have a terminal server and a power management
unit. Figure
3 below
shows an example of IOC connections.
Note that the terminal server and power management units are network
devices connected to the ethernet switch, and ultimately to the Operations
network. The power management unit
is optional, only specific IOC chassis might have one.
Figure
3. Typical IOC
Managed Connections
5. Required
Network and Serial Ports
1. The
estimated number of network ports required for each area of the LCLS is
summarized in Table 1 below. It is assumed that each ethernet switch
is capable of managing 24 network ports, while in practice there may be 48-port
switches.
Table
1. Network
Port Number Estimates, as of February 2006
Area |
Location |
Network |
Injector Area (IN20) |
RF Hut in Klystron Gallery,
Sector 20, Rack LKG24 |
96 |
|
Injector Vault Stairwell |
48 |
LI21 |
|
24 |
LI22 |
|
24 |
LI23 |
|
24 |
LI24 |
|
48 |
LI25 |
|
24 |
LI26 |
|
24 |
LI27 |
|
24 |
LI28 |
|
24 |
LI29 |
|
24 |
LI30 |
|
24 |
Bldg 136 |
|
24 |
Bldg 106 |
|
24 |
Bldg 005 (MCC) |
|
72 |
Bldg 105 |
|
24 |
Bldg 406 |
|
24 |
Support Bldg 2.1 |
|
24 |
Support Bldg 2.2 |
|
24 |
Support Bldg 2.3 |
|
48 |
Support Bldg 3.1 |
|
48 |
Front-end Enclosure |
Hutch 1, before Gas
Attenuator Area |
24 |
|
Hutch 2 |
24 |
|
Hutch 3 |
24 |
Near-end Hall |
Hutch 2 |
24 |
X-ray Tunnel |
Between hutches 2 and 3 |
24 |
Far-end Hall |
Hutch 2 |
24 |
Total Number of Network Ports |
|
864 |
Total Number of Ethernet
Switches |
|
36 |
2.
The estimated number of serial ports required for each area of
the LCLS is summarized in Table 2 below.
Note that a single terminal server is assumed to be capable of 8, 16 or 32
connections depending on a plug-in modules and cable.
Table
2. Serial
Port Number Estimates as of February 2006
Area |
Location |
Serial |
Injector Area (IN20) |
RF Hut in Klystron Gallery,
Sector 20, Rack LKG24 |
24 |
|
Injector Vault Stairwell |
16 |
LI21 |
|
8 |
LI22 |
|
8 |
LI23 |
|
8 |
LI24 |
|
16 |
LI25 |
|
8 |
LI26 |
|
8 |
LI27 |
|
8 |
LI28 |
|
8 |
LI29 |
|
8 |
LI30 |
|
8 |
Bldg 136 |
|
8 |
Bldg 106 |
|
8 |
Bldg 005 (MCC) |
|
16 |
Bldg 105 |
|
8 |
Bldg 406 |
|
8 |
Support Bldg 2.1 |
|
8 |
Support Bldg 2.2 |
|
8 |
Support Bldg 2.3 |
|
8 |
Support Bldg 3.1 |
|
16 |
Front-end Enclosure |
Gas Attenuator Area |
16 |
|
Hutch 2 |
16 |
|
Hutch 3 |
16 |
Near-end Hall |
Hutch 1 |
16 |
|
Hutch 3 |
8 |
X-ray Tunnel |
Hutch 2 |
16 |
|
Hutch 3 |
16 |
Far-end Hall |
Hutch 3 |
16 |
Total Number |
|
336 |
Total Number of Terminal
Servers |
|
30 |
6.
There shall be physical connection point (i.e. RJ45 wall
jacks, or "walk-up" taps) located at specific points in the LCLS
accelerator equipment areas.
1.
Only mobile computers and laptops configured by the LCLS
Controls Group shall be usable in the LCLS
accelerator equipment areas. Other
computers will not be recognized nor allowed access to control system
functionality on the Operations network, nor will they have access to the
Internet or other SLAC services through the Operations network.
2.
Many locations in the LCLS accelerator equipment areas shall
have "walk-up" taps.
This includes the injection vault, klystron gallery, Linac tunnel, BSY,
LTU and undulator areas, the XTOD areas and the X-ray beamlines. Their numbers are yet to be determined,
but they will be part of the port allocation described above for each of those
areas.
7.
Secure and restricted wireless access shall be provided.
1.
Wireless access shall be available throughout the LCLS
accelerator, including the injection vault, klystron gallery, Linac tunnel,
BSY, LTU and undulator areas, the XTOD areas and the X-ray beamlines.
2.
Wireless transceivers shall not be permanently mounted in the
accelerator areas. There shall be a small pre-determined number of portable
pre-configured transceivers used for commissioning and maintenance purposes.
3.
Wireless access shall only be available to people having SLAC
accounts, who also have LCLS Control System accounts. See Requirement 8.1
below.
8. Access
to the operations network shall be restricted to a well-known set of users.
1.
Certain individuals shall be able to login directly to control
consoles. These users shall have a
standard SLAC computer account, and their LCLS Controls account shall have a
user ID consistent with their ID on the SLAC network.
2.
Certain types of users
shall be able to login directly to control consoles in the control room. For instance, there shall be provision
for general operator login in the control room, with potentially limited
abilities.
3.
Other users may retrieve data and interact with certain
control system software through an EPICS Gateway service, which acts as a
proxy. Gateway servers reside on
the access control subnet, as stated in requirement 5.4
above.
9.
The operations network shall be completely isolated, without
access from any other SLAC subnet except for the Access Control subnet. Refer to requirement 5,
above and a short-term requirement described in requirement 8
below.
1.
No access to the operations network shall be granted to any
device other than one residing on the Access Control subnet.
2.
Certain SLAC services shall be made available to the
operations network. This includes
cable, drawing, support and technical databases, which shall be accessible from
any operator computer in the Operations network.
3.
Certain hardware and software resources at SLAC shall be made
accessible from the operations network as required. This includes access to
file sharing services such as AFS or NFS, or software tools that might be
requested on a temporary basis.
4.
Printing shall be possible from the operations network, and
forwarding to printers outside of the operations network shall be possible.
10.
Several computers shall reside in the operations network for
use as file or compute servers.
1.
No server shall have network connections to any network
outside of the operations network.
2.
At least one server shall provide a copy of the development
environment with a complete set of development tools, which will occasionally
but regularly be copied from the permanent tool location. These shall be used
only during unusual or emergency conditions, when access to the standard SLAC
development tools is not available.
7.
Subnet Requirements;
there shall be a set of virtual networks (VLans) available on the operations
network, to provide an organized structure to the network, and to isolate
specific functions of the accelerator which have bandwidth or timing
requirements.
There
will be several distinct VLans available, to be identified as design work
proceeds.
1.
The Fast Feedback subsystem shall have a separate VLan, and
will be populated by several IOCs with Beam Diagnostic data, and others with
Magnet Control capabilities.
2.
The Low-level RF (LLRF) subsystem shall have a separate VLan,
populated by several IOCs with RF phase, amplitude and other related readout
and control capabilities.
3.
The Beam Profile Camera subsystem for OTR and YAG monitors
shall have a separate VLan for camera image data. This is considered a tentative requirement pending further
beam diagnostic design.
4.
The Machine Protection System (MPS) shall occupy a separate
VLan.
5.
All other subsystems shall have the ability to belong to a
separate VLan dedicated to that subsystem. Details are forthcoming pending design decisions.
8. Temporary
SLC-aware IOC Connection; short-term access to the SLC/Linac Accelerator
Control Network shall be provided, to allow the existing MCC
Control System to control SLC-aware IOCs.
2.
The VMS computer currently used for accelerator controls shall
have secure access to a file server located in the LCLS operations network.
Non-functional Requirements
1.
Development subnet;
all network devices on the development subnet shall have the ability to
communicate at speeds up to 100 Mbps.
2.
Test subnet; all
network devices on the test subnet shall have the ability to communicate at
speeds up to 100 Mbps.
3.
Access Control subnet;
all network devices on the access control subnet shall have the ability to
communicate at speeds up to 1000 Mbps.
1.
Connections to other subnets in the LCLS network, or in the
larger SLAC network shall have the ability to communicate at 100 Mbps.
2.
Connections to the Operations network from the Access Control
subnet shall have the ability to communicate at speeds up to 1000 Mbps.
4.
Operations network;
all network devices on the operations network shall have the ability to
communicate at speeds up to 1000 Mbps.
Schedule Requirements
1.
The Development subnet shall be implemented in several stages
to accommodate LCLS Controls Group development work.
1.
The Development server shall be physically installed by
November 1, 2005.
2.
The Development server shall be setup and configured by
December 1, 2005.
3.
Developers shall be able to configure IOCs, build software and
do basic IOC tests on the development subnet by December 1, 2005.
2.
The Test subnet shall be implemented as needs arise, but not
before December 31, 2005.
3.
The Operations network shall be implemented according to a
detailed schedule (see separate document) with specific milestones.
1.
Network access to the injector area building at sector 20
shall be available by May 15, 2006.
2.
Network access to the klystron galleries for each sector from
21 through 30 shall be available by December 2007.
3.
Network access to the Linac BSY and LTU areas shall be
available by April 2008.
4.
Network access to the Undulator hall, beam dump and Front-end
enclosure areas shall be available by June 2008.
5.
Network access to the Front-end enclosure of the XTOD area
shall be available by June 2008.
6.
Network access to the Near Hall of the XTOD area shall be
available by June 2008.
7.
Network access to the X-ray transport lines of the XTOD area
shall be available by September 2008.
8.
Network access to the Far Hall of the XTOD area shall be
available by November 2008.
Cost Requirements
1.
The total cost of the development subnet equipment shall be
the responsibility of the SCCS group and the LCLS
Controls Group.
1.
The cost of cables, switches and other network related
hardware for the development subnet shall be the responsibility of the SCCS
Group, according to current SLAC computing policy.
2.
The cost of servers, desktop computers, laptops and single
board computers for the development subnet shall be the responsibility of the LCLS
Controls Group.
2.
The total cost of the test subnet shall be the responsibility
of the LCLS Controls Group.
3. The total cost of the Access Control subnet equipment shall be the combined responsibility of the SCCS group and the LCLS Controls Group.
1.
The cost of cables and ethernet switches for the access
control subnet shall be the responsibility of the SCCS Group, according to
current SLAC computing policy.
2. The cost of other network equipment such as terminal servers, remote power management units, as well as computers such as servers, desktop computers, laptops and single board computers for the access control subnet shall be the responsibility of the LCLS Controls Group.
4.
The total cost of the Operations network equipment shall be
the responsibility of the LCLS Controls Group.
Suggestions for Implementation
The diagram in Figure
4
shows a conceptual layout of the required network. The four networks described
above are shown; the operations network,
and the development, test and access control (DMZ) subnets.
Figure
4. The LCLS
Conceptual Network
Although the development, test and access control subnets
are conceptually on the same level, they may in practice be on completely
different subnets, separated by layers of network equipment.
The diagram in Figure
5
shows a few of the components from the existing SLAC/PEP control system, and
specifically the linkage implied from requirement 8.1
above.