Present: Prry Anthony, Peter Bosted, Don Crabb, Keith Griffioen, Bill Olson, Steve Rock, John Weisend Photon Beam: meeting with Lab next week. Discussed goniormetr work. S. Africans coming out this summer; hopefully can work on software and controls, alignment issues. Compton Polarimetr: Peter simulated detecting single electrons only, as suggested by Yerevan group. Looks promising. Asked StLorant and Crabb about using lower Z target to reduce BH background. They will look for materials with low Z but still at least several percent polarized electrons in high mag. field, liquid nitrogen temp. Management: Prry got the RPC experimnts exempted from Davis-Bacon (means EFD techs can go plumbing, etc.) (because experiment, not facity). E160 Spectrometer Calcs. Quote from LBL remains same with final version. Req. is going through for both LBL and Duke. Piotr studied GEANT simulation and found two bugs; these reduce the backgrounds when fixed! E161 Target. SLAC buyer is proceeding with requisition process. Now, cannot talk to CPI unless SLAC purchasin office is involved, while bidding process is going on. Heat load at 1E9/spill is getting close to 500 mW limit of fridge. We need more accurate calculation. Maybe shortr targt better. John looking in cryo layout. Oxford called John: he said hope to order in October. E159 Target: Don writing note to coll. about using 5T magnet. Don should send drawings to John. E160 target: Peter changed some dimensions: detailed desing in progress. E160: Keith has a 1st year graduate student: will probably come out this summr. Need to work on MOA. Need to start desinging frmaes.