Attending: Peter Bosted, Don Crabb, Bill Olson, Steve Rock Preparations for Concptual Design Review of E160 well under way. Review will be on Junee 24, most of the day. Keith's students have made some nice drawings of the detectors. Talked about funding situation and document on "Staging RPC epxeriment" that Peter has drafted and will hand in today. Simulations show E160, half of E159, and maybe E161 can be done at 30 Hz and higher peak current (worse duty factor) which will save mucho electricity. Don's students are working on a cool down and studying various materials in the lab. Also working on a new NMR system. Steve is finding that random backgrounds for 2 muon mehtod for E161 looks to be large.