Accelerator Capabilities
Chapter 6: Accelerator Capabilities
Convener: W. A. Barletta
Working Group Summary (arXiv:1401.6114)
Subgroup Reports:
Contributed Papers:
General:
056 | S. Holmes, et al. | Project X: Accelerator Reference Design | 1306.5022 (PDF) |
063 | D. Asner, et al. | Project X: Broader Impacts | 1306.5024 (PDF) |
Accelerator Technology Development:
018 | P. Piot, et al. | The Advanced Superconducting Test Accelerator (ASTA) at Fermilab: A User-Driven Facility Dedicated to Accelerator Science & Technology | 1304.0311 (PDF) |
180 | C.G.R. Geddes, et al. | Computational accelerator science needs towards laser-plasma accelerators for future colliders | 1309.7398 (PDF) |
184 | R. J. England, et al. | Dielectric Laser Acceleration | 1309.7637 (PDF) |
196 | A. Alekou, et al. | Accelerator system for the PRISM based muon to electron conversion experiment | 1310.0804 (PDF) |
Hadron Colliders:
036 | C.M. Bhat, et al. | Proton-proton and electron-positron collider in a 100 km ring at Fermilab | 1306.2369 (PDF) |
Lepton Colliders:
002 | J. Brau, et al. | The International Linear Collider | 1304.2586 (PDF) |
037 | W. Chou, et al. | HFiTT - Higgs Factory in Tevatron Tunnel | 1305.5202 (PDF) |
084 | D. Dannheim, et al. | CLIC e+e- Linear Collider Studies - Input to the Snowmass process 2013 | 1305.5766 (PDF) |
101 | J-P. Delahaye, et al. | Enabling Intensity and Energy Frontier Science with a Muon Accelerator Facility in the U.S | 1308.0494 (PDF) |
113 | Y. Alexahin, et al. | Muon Collider Higgs Factory for Snowmass 2013 | 1308.2143 (PDF) |
115 | D. L. Rubin | CESR Test Accelerator | 1308.2325 (PDF) |
123 | V. I. Telnov | Comments on photon colliders for Snowmass 2013 | 1308.4868 (PDF) |
140 | E. Adli, et al. | A Beam Driven Plasma-Wakefield Linear Collider:From Higgs Factory to Multi-TeV | 1308.1145 (PDF) |
151 | Y. Cai, et al. | A Feasibility Study of an e+e- Ring Collider for Higgs Factory | 1309.2602 (PDF) |