2.6 Experimentation Update |
CHAPTERS | PDF, PostScript, and WWW browser information | ||
Foreword | PS | ||
1 | Introduction and General Overview of 500 GeV (c.m.) Machines | PS | |
2 | Working Groups | ||
2.1 | Injection Systems and Pre-Accelerators | PS | |
2.2 | Damping and Compression Systems | PS | |
2.3 | Linac Technology | PS | |
2.4 | Beam Dynamics | PS | |
2.5 | Beam Delivery | PS | |
2.6 | Experimentation | PS | |
3 | Upgrades and Other Options | ||
3.1 | Upgrades to 1 TeV c.m. and Above | PS | |
3.2 | Interaction Region for Gamma-Gamma and Gamma-Electron Collisions |
PS | |
4 | Experiments and Test Facilities | PS | |
5 | Present and Future Areas of Collaboration | PS | |
6 | Conclusions | PS | |
FIGURES | |||
Fig. 1.1 | Overall TESLA layout | PS | |
Fig. 1.2 | Basic module of the TESLA main linac | PS | |
Fig. 1.3 | TESLA cross-section at mid-point of a cryostat | PS | |
Fig. 1.4 | Overall SBLC machine layout | PS | |
Fig. 1.5 | SBLC linac tunnel layout | PS | |
Fig. 1.6 | JLC schematic layout | PS | |
Fig. 1.7 | JLC linac cross-section | PS | |
Fig. 1.8 | NLC schematic layout | PS | |
Fig. 1.9 | NLC possible tunnel layout | PS | |
Fig. 1.10 | Another possible NLC tunnel layout | PS | |
Fig. 1.11 | VLEPP general layout | PS | |
Fig. 1.12 | VLEPP schematic: 50 m supermodule in the tunnel | PS | |
Fig. 1.13 | VLEPP tunnel cross-section | PS | |
Fig. 1.14 | CLIC general layout | PS | |
Fig. 1.15 | CLIC tunnel layout | PS | |
Fig. 1.16 | CLIC two-beam accelerator layout | PS | |
Fig. 1.17 | CLIC injector complex | PS | |
Fig. 1.18 | CLIC single bunch schematic | PS | |
Fig. 2.3.1 | Main linac power units for 500 GeV c.m. | PS | |
Fig. 2.3.2 | JLC DLDS schematic | PS | |
Fig. 2.3.3 | NLC rf schematic | PS | |
Fig. 2.3.4a | TBLNC layout | PS | |
Fig. 2.3.4b | TBLNC rf waveform | PS | |
Fig. 2.3.5 | VLEPP rf schematic | PS | |
Fig. 2.5.1 | Beam delivery system sketch | PS | |
Fig. 3.2.1 | Gamma-gamma collider schematic | PS | |
Fig. 3.2.2 | Interaction region details | PS | |
Fig. 4.1a | FFTB layout | PS | |
Fig. 4.1b | FFTB vertical measurement | PS | |
Fig. 4.2 | TESLA test facility building | PS | |
Fig. 4.3 | S-band test facility general layout | PS | |
Fig. 4.4 | S-band test facility injector setup | PS | |
Fig. 4.5 | ATF | PS | |
Fig. 4.6 | NLCTA | PS | |
Fig. 4.7 | CTF1 | PS | |
Fig. 4.8 | CTF2 | PS | |
Fig. 4.9 | RTA test facility | PS |
PDF, PostScript, and WWW browser information
Best viewed using Netscape 3.0 with Times 12 font.
For information about this document,
This page modifed: April 1, 1997 - 10 a.m. PST - elm