ILC-TRC/1995 Report   ILC-TRC logo

 

Home
Charge
1995
2003

 

1995 Council
1995 Members
1995 Report

1995 Report

Report

Chapters

PDF, PostScript, and WWW browser information

  Foreword PDF PS

1

Introduction and General Overview of 500 GeV (c.m.) Machines

PDF PS
2
Working Groups
    2.1      Injection Systems and Pre-Accelerators PDF PS
     2.2      Damping and Compression Systems PDF PS
    2.3      Linac Technology PDF PS
     2.4      Beam Dynamics PDF PS
     2.5      Beam Delivery PDF PS
     2.6      Experimentation PDF (old)
PDF (rev 1/98)
PS (old)
PS (rev 1/98)

3

Upgrades and Other Options

     3.1       Upgrades to 1 TeV c.m. and Above PDF PS
     3.2       Interaction Region for Gamma-Gamma and Gamma-Electron Collisions PDF PS

4

Experiments and Test Facilities

PDF PS

5

Present and Future Areas of Collaboration

PDF PS

6

Conclusions

PDF PS
Figures
Fig. 1.1 Overall TESLA layout PDF PS
Fig. 1.2 Basic module of the TESLA main linac PDF PS
Fig. 1.3 TESLA cross-section at mid-point of a cryostat PDF PS
Fig. 1.4 Overall SBLC machine layout PDF PS
Fig. 1.5 SBLC linac tunnel layout PDF PS
Fig. 1.6 JLC schematic layout PDF PS
Fig. 1.7 JLC linac cross-section PDF PS
Fig. 1.8 NLC schematic layout PDF PS
Fig. 1.9 NLC possible tunnel layout PDF PS
Fig. 1.10 Another possible NLC tunnel layout PDF PS
Fig. 1.11 VLEPP general layout PDF PS
Fig. 1.12 VLEPP schematic: 50 m supermodule in the tunnel PDF PS
Fig. 1.13 VLEPP tunnel cross-section PDF PS
Fig. 1.14 CLIC general layout PDF PS
Fig. 1.15 CLIC tunnel layout PDF PS
Fig. 1.16 CLIC two-beam accelerator layout PDF PS
Fig. 1.17 CLIC injector complex PDF PS
Fig. 1.18 CLIC single bunch schematic PDF PS
Fig. 2.3.1 Main linac power units for 500 GeV c.m. PDF PS
Fig. 2.3.2 JLC DLDS schematic PDF PS
Fig. 2.3.3 NLC rf schematic PDF PS
Fig. 2.3.4a TBLNC layout PDF PS
Fig. 2.3.4b TBLNC rf waveform PDF PS
Fig. 2.3.5 VLEPP rf schematic PDF PS
Fig. 2.5.1 Beam delivery system sketch PDF PS
Fig. 3.2.1 Gamma-gamma collider schematic PDF PS
Fig. 3.2.2 Interaction region details PDF PS
Fig. 4.1a FFTB layout PDF PS
Fig. 4.1b FFTB vertical measurement PDF PS
Fig. 4.2 TESLA test facility building PDF PS
Fig. 4.3 S-band test facility general layout PDF PS
Fig. 4.4 S-band test facility injector setup PDF PS
Fig. 4.5 ATF PDF PS
Fig. 4.6 NLCTA PDF PS
Fig. 4.7 CTF1 PDF PS
Fig. 4.8 CTF2 PDF PS
Fig. 4.9 RTA test facility PDF PS

Tables

This section contains links to updated information and the original tables, text and drawings found in the first ILC-TRC Report published in December, 1995.

bullet9/99 Updated Megatable 1.1 - Overall and Final Focus Parameters - 500 GeV (c.m.)
bullet9/99 UpdatedMegatable 1.2 - Pre-linacs, Damping Rings and Main Linac Parameters - 500 GeV (c.m.)
bullet9/99 Updated Megatable 3.1 - Overall and Final Focus Parameters - 1 TeV (c.m.)
bullet9/99 Updated Megatable 3.2 - Pre-linacs, Damping Rings and Main Linac Parameters - 1 TeV (c.m.)
bullet9/99 Updated Machine Drawings
bullet1/98 Updated Chapter 2.6 Experimentation Status
bullet12/98 Updated Table 4.1 - Progress from LC Test Facilities
bulletOriginal Table 4.1 - Progress from LC Test Facilities
bulletTable 2.1.2 - Positron Sources

Forms

bulletOn-line Update Forms - send in your updated machine information

 

General questions or comments:  G. Loew or L. White
Questions about the page: Reitmeyer.