|
|
|
Foreword |
PDF |
PS |
1
|
Introduction and General Overview of 500
GeV (c.m.) Machines
|
PDF |
PS |
2
|
Working Groups
|
|
2.1
Injection Systems and Pre-Accelerators |
PDF |
PS |
|
2.2
Damping and Compression Systems |
PDF |
PS |
|
2.3 Linac
Technology |
PDF |
PS |
|
2.4 Beam
Dynamics |
PDF |
PS |
|
2.5 Beam
Delivery |
PDF |
PS |
|
2.6
Experimentation |
PDF (old)
PDF (rev 1/98) |
PS (old)
PS (rev 1/98) |
3
|
Upgrades and Other Options
|
|
3.1
Upgrades to 1 TeV c.m. and Above |
PDF |
PS |
|
3.2
Interaction Region for Gamma-Gamma and Gamma-Electron Collisions |
PDF |
PS |
4
|
Experiments and Test Facilities
|
PDF |
PS |
5
|
Present and Future Areas of Collaboration
|
PDF |
PS |
6
|
Conclusions
|
PDF |
PS |
Figures |
Fig. 1.1 |
Overall TESLA layout |
PDF |
PS |
Fig. 1.2 |
Basic module of the TESLA main linac |
PDF |
PS |
Fig. 1.3 |
TESLA cross-section at mid-point of a
cryostat |
PDF |
PS |
Fig. 1.4 |
Overall SBLC machine layout |
PDF |
PS |
Fig. 1.5 |
SBLC linac tunnel layout |
PDF |
PS |
Fig. 1.6 |
JLC schematic layout |
PDF |
PS |
Fig. 1.7 |
JLC linac cross-section |
PDF |
PS |
Fig. 1.8 |
NLC schematic layout |
PDF |
PS |
Fig. 1.9 |
NLC possible tunnel layout |
PDF |
PS |
Fig. 1.10 |
Another possible NLC tunnel layout |
PDF |
PS |
Fig. 1.11 |
VLEPP general layout |
PDF |
PS |
Fig. 1.12 |
VLEPP schematic: 50 m supermodule in the
tunnel |
PDF |
PS |
Fig. 1.13 |
VLEPP tunnel cross-section |
PDF |
PS |
Fig. 1.14 |
CLIC general layout |
PDF |
PS |
Fig. 1.15 |
CLIC tunnel layout |
PDF |
PS |
Fig. 1.16 |
CLIC two-beam accelerator layout |
PDF |
PS |
Fig. 1.17 |
CLIC injector complex |
PDF |
PS |
Fig. 1.18 |
CLIC single bunch schematic |
PDF |
PS |
Fig. 2.3.1 |
Main linac power units for 500 GeV c.m. |
PDF |
PS |
Fig. 2.3.2 |
JLC DLDS schematic |
PDF |
PS |
Fig. 2.3.3 |
NLC rf schematic |
PDF |
PS |
Fig. 2.3.4a |
TBLNC layout |
PDF |
PS |
Fig. 2.3.4b |
TBLNC rf waveform |
PDF |
PS |
Fig. 2.3.5 |
VLEPP rf schematic |
PDF |
PS |
Fig. 2.5.1 |
Beam delivery system sketch |
PDF |
PS |
Fig. 3.2.1 |
Gamma-gamma collider schematic |
PDF |
PS |
Fig. 3.2.2 |
Interaction region details |
PDF |
PS |
Fig. 4.1a |
FFTB layout |
PDF |
PS |
Fig. 4.1b |
FFTB vertical measurement |
PDF |
PS |
Fig. 4.2 |
TESLA test facility building |
PDF |
PS |
Fig. 4.3 |
S-band test facility general layout |
PDF |
PS |
Fig. 4.4 |
S-band test facility injector setup |
PDF |
PS |
Fig. 4.5 |
ATF |
PDF |
PS |
Fig. 4.6 |
NLCTA |
PDF |
PS |
Fig. 4.7 |
CTF1 |
PDF |
PS |
Fig. 4.8 |
CTF2 |
PDF |
PS |
Fig. 4.9 |
RTA test facility |
PDF |
PS |