SLAC-PUB-7919
PEP-II Status Report
Abstract
The main design features of the PEP-II asymmetric two-ring
electron-positron B Factory collider, built at the Stanford Linear
Accelerator Center, are described. This facility will complete
construction in June 1998. The high energy ring, completed in May
1997, has had 3 months of commissioning and successfully stored 0.75 A
of electrons. The success of the high energy ring testing validates
not only its ring components, but also the injection system, the RF
system and the control system all of which are common to the two
rings.
Full Text
PDF
Compressed PostScript
More Information
Full bibliographic data for this document, including its complete author list,
is (or soon will be) available from SLAC's
SPIRES-HEP
Database.
Please report problems with this file to
posting@slac.stanford.edu.
The SLAC preprint inventory is provided by the
SLAC Technical Publications Department.
Page generated 04 Apr 2001 @ 15:08 PDT by htmlme.pl