Commissioning of the PEP-II High Power RF Systems
Abstract
We describe the commissioning of the high-power RF stations for the
PEP-II B factory. This includes in-situ testing and conditioning of
components after installation, phasing of cavities within each station
and between stations in each ring, capture of fist beam, stored-beam
operation at low- and moderate-current, commissioning of feedback
loops, and high-current operation. Performance of the overall system
and of critical components such as klystrons, cavities, windows,
tuners and the HOM suppression scheme is reported. Observation of beam
motion and signals in the cavity and HOM loads suggest that the HOM
impedance reduction necessary for high-current operation has been
achieved.
Full Text
PDF
Compressed PostScript
Not available for this document.
More Information
Full bibliographic data for this document, including its complete author list,
is (or soon will be) available from SLAC's
SPIRES-HEP
Database.
Please report problems with this file to
posting@slac.stanford.edu.
The SLAC preprint inventory is provided by the
SLAC Technical Publications Department.
Page generated 04 Apr 2001 @ 15:08 PDT by htmlme.pl