Minutes from the 10/06/04 LCLS SLC IOC meetings. Next Meeting: 10/13/04, 9:30am, in B5, second floor. (1) Control System Down - IOC needs to keep track that no ack is done and re-update database later. Debbie. (2) Proxy Down Test - test that reconnect when proxy comes back up, also need channel access stop and restart. Diane. (3) Global Section Major and Minor ID - send down to IOC. IOC will be like a PEPII ethernet micro in that no updates allowed from the IOC until a successful "IPL". Tony. (4) CMLOG - want ability to direct messages to individual SCPs. Source will be added to various places (iocCmlog, fwdBro, VMS side). RonM. (5) CMLOG - test log-only. RonM. (6) MSG Task Prototype - after looking at the proxy source, Diane discovered that binding is not needed. No longer have the 2 min wait. (7) EPICS-to-VMS time conversion and difference routines needed (net_get_time and difft* equivalents) - Diane (8) DB Task Prototype - working on ST0 offset conversions. Can't use anything in dirty_zero.c. Can't change structures. Debbie says it's a lot of tedious work. (9) Magnet Task - Dayle is sorting through magnet messages.