Final Design Review: LCLS Injector and Linac Vacuum Controls Hardware
Date: Thursday, April 6, 2006
Location: Building 34 Conference Room
Time: 9:00 - 11:00 AM
Meeting Minutes (Microsoft Word document)
Committee Report (Microsoft Word document)
Scope of the Review
Controls hardware for vacuum equipment in the LCLS injector and linac, through BC1
Review Materials
Announcement of Review: Review Committee Members, Charges to Review Committee, Agenda (Microsoft Word document)
Final Design Report (Microsoft Word document, 7 MB)
Final Design Review Presentation (PowerPoint, 2 MB)
Additional Materials
Vacuum Controls Requirements (ESD 1.1-326)
Contact: Stephen Schuh
Last Modified: 11 April 2006