LCLS Controls
Event System
System Functional Requirements and Design
- LCLS Controls Timing (Confluence WIKI)
- SLAC Timing System Upgrade Thoughts
- Event System Evaluation and Performance Evaluation
- Spreadsheets for block diagram, HW trigger list, EVR IOC list
- LCLS Spec 1.2-206: Timing Controls Specification
- LCLS timing system overview
- Scenario: failed LINAC vacuum
- Event Code Sequences
- Toroid Trigger Reqts
- BCS Trigger System Diagram
- BYKIK (LTU Kicker) Trigger System Diagram
- BYKIK (LTU Kicker) Trigger Logic Diagram
- Kicker Timing Reqts, 23 Mar 2006
- Pockels Cell Timing Reqts, 23 Mar 2006
- Timing Trigger System ESD Revision 3, 17 Apr 2006
- Event Definition API
PNET Module Design
- PNET Receiver Design Specifications (ESD)
- PNET Receiver Detailed Design, Reviewer's Comments
- PNET VME Address Map by Dave Brown, 10 February 2005
Related Physics Requirements Documents
- LCLS Spec 1.1-305: Timing System
- LCLS Spec 1.1-104: BXKIK Pulser ESD
- LCLS Spec 1.1-301: Feedback Systems
- LCLS Spec 1.1-304: RF Controls ESD
- LCLS Spec 1.1-307: High-Level Software Applications Packages
- LCLS Spec 1.1-312: Machine Protection System ESD
- LCLS Spec 1.1-314: Beam Position Measurement System
- LCLS Spec 1.1-315: Requirements for Horizontal Tcav-Kicker Dipole Magnet
- LCLS Spec 1.1-323: Linac Wire Scanner System
- LCLS Spec 1.2-001: Injector
- LCLS Spec 1.2-003: Injector Transverse RF Deflector
- LCLS Spec 1.2-021: Injector Profile Monitors (OTR and YAG)
- LCLS Spec 1.2-030: Injector and Linac Toroids and Faraday Cups
- LCLS Spec 1.2-135: S-Band Low Level RF Controls Interface & Timing ESD
- LCLS Spec 1.2-136: S-Band Low Level RF Phase Reference System ESD
- LCLS Spec 1.2-137: S-Band Low Level RF Monitor and Control System ESD
- LCLS Spec 1.2-201: Injector Controls ESD
- LCLS Spec 1.2-202: Injector Drive Laser System ESD
- LCLS Spec 1.2-203: Injector Drive Laser Transport, Conditioning and Launch System ESD
- LCLS Spec 1.3-011: Sector 25 Transverse RF Deflector
- LCLS Spec 1.3-012: DL1 Dog-Leg Pulse Dipole Magnets
- LCLS Spec 1.3-014: Beam Abort Magnet and Dump
- LCLS Spec 1.3-015: Horizontal Tcav-Kicker Dipole Magnet
- LCLS Spec 1.3-018: Single-Shot Relative Bunch Length Monitor
- LCLS Spec 1.4-117: RF Beam Position Monitor ESD
Event Generator (EVG) and Receiver (EVR)
- PMC-EVR Installation Instructions
- Test System Register Setup
- LCLS VME Event Module List
- LCLS PMC Event Receiver List
- Manufacturer is Micro-Research Finland Oy
- Event System Manual - 100 series
- Event Generator (EVG-200) Technical Reference (FW E306)
- Event Generator (EVG-230) Technical Reference (FW E400)
- Event Receiver (VME-EVR-200(RF)) Technical Reference (FW D308)
- Event Receiver (VME-EVR-230(RF)) Technical Reference (FW D502)
- Event Receiver (PMC-EVR) Technical Reference 003
- PLC-9030-DataBook.pdf
EVG and EVR Papers and Presentations
- The LCLS Timing System, May, 2010
- Timing and Synchronization at the LCLS, May, 2007
- Micro-Research Finland Oy Timing System Modules, June 2006
- Diamond Timing System Modules, Oct 2005
- Diamond Timing System Developments, Oct 2003
- New Features of the SLS Timing System, Oct 2003
- SLS Timing Master and Slaves, June 2003
- SLS Timing System, Nov 2002
- SLS Timing Pattern Generator, Nov 2002
- Timing System of the Swiss Light Source, Nov 2001 ps
- Review of Accelerator Timing Systems, Oct 1999
EPICS Support
- SourceForge Browser for the mrfApp IOC Module
- SLAC CVS Browser for the event (containing mrfApp) IOC Module
- PSI Timing How-To FAQ, Oct 2005
- Global Event System, Dec 2003
- Synchronized Time Stamp Support, Aug 1998
- APS Timing System Observations, Mar 1994
SLC Timing System
- SLC Principles of Operation: Timing System
- PDU II Hardware Description
- Notes by Tony Gromme, 3/2004 Note: to access VMS files from unix, path is slcs1:/mccdev/nfs_ref. As an eg, the first file referenced in this doc is: REF_RMX_TIME:TIMING_DOWNLOAD.C86. It is found in: /mccdev/nfs_ref/rmx/time/timing_download.c86
- SLC Timing System Description by Tony Gromme, 1999
- SLC Master Pattern Generator Description by Tony Gromme, 1999
- SLC Regional Beamcodes Description by Tony Gromme, 1995
- Copy of SLC Micro Timing Job Source
- PRIMARY.DBS
Presentations
- Accelerator Timing System at SLAC, EPICS Collaboration Meeting (SLAC) Timing Workshop, April 2012
- Introduction to the LCLS Timing System, SLAC/KEK Meeting, Dec 2011
- LCLS Event System, EPICS Collaboration Meeting (Vancouver), May 2009
- LCLS Timing and Event System - An Overview, MCC Ops Meeting, Oct 21, 2008
- LCLS Event System Software, MCC Ops Meeting, Oct 21, 2008
- LCLS Beam Synchronous Acquisition on IOCs, LCLS Meeting, Sep 23 2008
- LCLS Beam Synchronous Acquisition for IOC Engineers, LCLS IOC Meeting, July 2008
- LCLS Event Displays, LCLS IOC Meeting, March 2008
- LCLS Event System Record Processing, March 2008
- LCLS Timing and Event System - An Introduction, USPAS (CA), Jan 2008
- LCLS Event System IOC How-To, LCLS Controls SW Meeting, December 2007
- LCLS Event System, EPICS Collaboration Meeting (DESY), April 2007
- LCLS Event System, EPICS Collaboration Meeting (Argonne), June 2006
- Timing, FAC Meeting, April, 2006
- LCLS Kicker Power Supply, Design Review, SLAC, March, 2006
- Timing, Lehman Review, SLAC, February, 2006
- Timing, LCLS System Concept Review/Preliminary Design Review, SLAC, November, 2005 Comments
- LCLS Timing, Lehman Review, May, 2005
- LCLS Timing, EPICS Collaboration Meeting (SLAC), April, 2005
- LCLS Controls Architecture Timing Discussion, November, 2004: Dayle's Notes, Bob's Notes
LCLS Controls | EPICS at SLAC | SLAC Computing | SLAC Networking | SLAC Home Contact: Stephanie Allison
Last Modified: May 8, 2013