Color Code

Complete

Warning

System checkout

Phase II

2006 Drop Dead Dates
Description
Start
Date
End
Date
Linac down
Aug 30, 2006
Dec 31, 2006
Injector search and PPS
MUST BE  DONE AFTER THE LINAC BECAUSE
OF THE VARIABLE VOLTAGE SUPPLY (VVS).
However the linac can be easily opened
up again after and li21 researched in 1-hour

search can be done during swing
pps certification must be done during the day




2-hour
2-weeks
Linac search and PPS
begin 2.5 weeks weeks before rf
search can happen during swing
pps certification must be done durning the day

2-days
2-weeks
Pepii Run
Jan 1, 2007
7-months
LCLS Beam
Feb 5, 2007
6-Months

Delivery of HW

Order
Date
Arrival
Date
Outstanding
Items
Intermediate PS
Dec 26, 2005
April 7, 2006

Bulk PS
Nov 5, 2005
arrived Jan 25, 2006

Transductors
Sep 6, 2005
here

SLAC Ethernet PS Controller
  Injector
  BC1

Sep  1, 2005
Oct 10, 2005

Mar 31, 2006
Mar 31, 2006

Racks
Jan 27, 2006
June 30, 2006
1 of 3 double bay racks is here in bld24 high bay.
MCOR's
Oct 10, 2005
Feb 28, 2006
9 MCOR crates
3 Interface Boards
Misc cabe conn./clamps

Bench Test of HW
Start Date
Num of Weeks
Intermediate PS
Apr 10 2006
2 weeks
Transductors
done

SLAC Ethernet PS Controller
Feb 28, 2006
test done during assembly
Racks


Article 1 - type 1 and 2
June 5, 2006
1-day
Article 1 - type 3
June 15, 2006
1-day
MCOR's
Mar 15, 2006
2 weeks - 80% completed
Bulk PS's
Feb 28 2006
1 week

Assembly  and Test
Start Date
Num of Weeks
Assembly and Bench Testing
Dec 1, 2005
12-14 weeks
Pull cables


  laser room to sector 20
Apr 27, 2006
6-weeks
  I&C Cable installation
Jun 9, 2006
2-weeks
  Cable termination
Jul 5, 2006
2-weeks
  Connect cable to device and load
Aug 1, 2006
2-weeks
  bc1 to sector 20
Oct 1, 2006
8-weeks
AC Power to sector 20
Jul 19, 2006

    Pull  cables
Jun 26, 2006
1-week
    Wire AC to racks
      Postponed until
(Jul 5, 2006)
July 26, 2006
2-weeks
Magnets Installed
  Injector
  BC1

Jun 1, 2006
Aug 15, 2006

8-weeks
8-weeks
Populate Rack
   install equip in racks & wire
   system test

June 7, 2006
July 15 , 2006

   6 weeks
   4 weeks
Rack Installation and wiring


   install rack & wire sector 20
   wire for bc1
Sep 1, 2006
Sep 1, 2006
1-week
1 week
Integration System checkout
    High pot
    check polarity
    software integration: trim,etc...
Oct 22, 2006
4-weeks
Injector Commissioning
Jan 1, 2006
July 20, 2006

Reviews
Scheduled Date
Status
SLC-Aware IOC Functional Requirments Review

Done
SLC-Aware IOC Design Review

Done
EPICS Software Functional Requirements Review

Done
EPICS Software Design Review
April, 2006

Formal Hardware Review for Injector/BC1
Mar 23, 2006

Formal Software Design Review
July 13, 2006


Documentation
Start
Date
Num
of Weeks
Magnet Controls Engineering Specification Documentent


Magnet Controls and Fast Feedback Interface Control Document


Magnet Controls and MPS Interface Control Document


Magnet Controls and XAL Interface Control Document

Magnet Controls User's Guide




Software Task
Start
Date
Num
of Weeks
 Status
Assigned

SLC-Aware





    Functional Requirements


Done
K. Luchini

    Design Review


Done
rodgin,saa,luchini

    Write software

8-weeks
Done
D. Rogind,luchini

    Debug: Alpha <-> SLC Aware

6-weeks
Done
D. Rogind

    Testing: Alpha <-> SLC Aware

2-weeks
Done
D. Rogind

    Debug: EPICS <-> SLC Aware
Jun 21, 2005
4-weeks

D. Rogind

    Testing: EPICS<->Alpha
Jun 21, 2006
3-weeks

D. Rogind

EPICS Software





    Functional Requirements


Done
K. Luchini

    Design Review
April 9, 2006


Luchini, Rogind

    VME Analog Module Evaluation
Feb 21, 2006
1-week
in progress
K. Luchini

     Test-Stand
Mar 8, 2006


K. Luchini

         Software and VME setup

1-week

K. Luchini

         EDM Displays

1-day

K. Luchini

         Cable drawings

3-days

J. Dusatko

         Build cables

2-days

M. Harms

         MCOR

3-days

A. de Lira

         Ethernet PS Controller

3-days

D. MacNair

         Archiver

1-day

B. Hall

     Driver Support





        Acromag IP-445

1-hour
done
S. Allison

        Acromag IP-440

1-hour
done
S. Allison

        AcromagAVME9670

1-hour
done
S. Allison

        EPSC 

1-hour
done
S. Allison

        Acromag IP-231

1-hour

K. Luchini
 
        Hytec IP-ADC-8413

2-days

K. Luchini

        PLC EtherNet/IP

1-hour
done
S. Schuh

     Device Support
Nov 15,2006
1-week

K. Luchini

        Diagnostic





     SNL Sequences





        Trim
Jun 8, 2006
2-week
done
D. Rogind

        Calibrate
Sep 1, 2006
2-week

D. Rogind

        Standardize
Sep 21,2006
3-week

K. Luchini

        Degaus (matlab)
Oct 10,2006
3-days



     Debug
May 1, 2006
2-weeks

K. Luchini

     System checkout
Oct 22,2006
2-week

K. Luchini

EPICS DB





  Databases
Jan 3, 2006
4-weeks

S. Allison

  Templates
Feb 15,2005
2-weeks

S. Allison

  Database utilities





Channel Archiver
Oct 15 2006
1-days

K. Luchini

Channel Watcher
Oct 15,2006
1-days

K. Luchini

Alarm Handler
Oct 15,2006
3-days

K. Luchini

Configuration files
Nov 20,2006
1-week

K. Luchini

EDM Displays
    Mockup Displays
    Test Displays

May 2006
Jul 2006


2-weeks
1-week

D. Rogind
D. Rogind

    Main Displays
Aug 2006

3-days
K. Luchini

    Primary Diag Displays         


3-days
K. Luchini

    Plots
Dec 2006

3-days
K. Luchini

    Secondary Diag displays
Dec 2006

3-days
K. Luchini

Operator Help - WIKI
Jan 2006

2-weeks
K. Luchini

SCP Panels
Oct 2005
1-week
Done
N. Spencer

SCP Help

1-days

K. Luchini

DB Unit Num Spec


Done
S. Allison

SLC DB





   Test DB
Aug 2005
2-days
Done
N. Spencer

    Injector DB
Dec 2005
1-week
Done
N. Spencer

    BC1 DB
Dec 2005
3-days
Done
N. Spencer

    DBgen
Dec 2005
1-day
Done
K. Underwood

   DB edit: poly, hsta
Jan 3, 2006
1-day
on hold
N. Spencer

SLC Micro Mag Job
Jul 2005
4-hours
Done
K. Underwood

Alpha Mag App
   ACCESS
    LGPS On/Off/Reset
    LI21 Quad Switch Over



1 day
4-hours
4 -hours

Done

K. Underwood
K. Underwood
K. Underwood

Alpha Model
Aug 1,2006
4-weeks

M. Woodley

CA Server Write Access



TBD

Pre-Installation Checkout
Jul 24, 2006
4-weeks

K. Luchini

Integration System Checkout
Oct 22, 2006
3-weeks

K. Luchini


 


Content Owner: Kristi Luchini