Color
Code
|
Complete
|
|
Warning
|
|
System checkout
|
|
Phase
II
|
2006 Drop Dead Dates
Description
|
Start
Date
|
End
Date
|
Linac down
|
Aug 30, 2006
|
Dec 31, 2006
|
Injector
search and PPS
|
MUST BE DONE AFTER THE LINAC
BECAUSE
OF THE
VARIABLE VOLTAGE SUPPLY (VVS).
However the linac can be easily opened
up again after and li21 researched in 1-hour
search can be done during swing
pps certification must be done during the day
|
2-hour
2-weeks
|
Linac search
and PPS
|
begin 2.5
weeks weeks before rf
search can happen during swing
pps certification must be done durning the day
|
2-days
2-weeks
|
Pepii Run
|
Jan 1, 2007
|
7-months
|
LCLS Beam
|
Feb 5, 2007
|
6-Months
|
Delivery
of HW
|
Order
Date
|
Arrival
Date
|
Outstanding
Items
|
Intermediate
PS
|
Dec
26, 2005
|
April
7, 2006
|
|
Bulk
PS
|
Nov
5, 2005
|
arrived
Jan 25, 2006
|
|
Transductors
|
Sep
6, 2005
|
here
|
|
SLAC
Ethernet PS Controller
Injector
BC1
|
Sep 1, 2005
Oct 10, 2005
|
Mar 31, 2006
Mar 31, 2006
|
|
Racks
|
Jan
27, 2006
|
June 30, 2006
|
1 of 3 double
bay racks is here in bld24 high bay.
|
MCOR's
|
Oct
10, 2005
|
Feb
28, 2006
|
9
MCOR crates
3 Interface Boards
Misc cabe conn./clamps
|
Bench
Test of HW
|
Start
Date
|
Num
of Weeks
|
Intermediate
PS
|
Apr
10 2006
|
2
weeks
|
Transductors
|
done
|
|
SLAC Ethernet
PS Controller
|
Feb
28, 2006
|
test done
during assembly
|
Racks
|
|
|
Article
1 - type 1 and 2
|
June
5, 2006
|
1-day
|
Article 1 -
type 3
|
June 15, 2006
|
1-day
|
MCOR's
|
Mar
15, 2006
|
2
weeks - 80% completed
|
Bulk
PS's
|
Feb
28 2006
|
1
week
|
Assembly
and Test
|
Start
Date
|
Num
of Weeks
|
Assembly and
Bench Testing
|
Dec
1, 2005
|
12-14 weeks
|
Pull
cables
|
|
|
laser
room to sector 20
|
Apr 27, 2006
|
6-weeks
|
I&C
Cable installation
|
Jun 9, 2006
|
2-weeks
|
Cable
termination
|
Jul 5, 2006
|
2-weeks
|
Connect
cable to device and load
|
Aug 1, 2006
|
2-weeks
|
bc1 to sector 20
|
Oct
1, 2006
|
8-weeks
|
AC
Power to sector 20
|
Jul
19, 2006
|
|
Pull cables
|
Jun 26, 2006
|
1-week
|
Wire AC to racks
Postponed until
|
(Jul 5, 2006)
July 26, 2006
|
2-weeks
|
Magnets
Installed
Injector
BC1
|
Jun 1, 2006
Aug 15, 2006
|
8-weeks
8-weeks
|
Populate Rack
install equip in racks & wire
system test
|
June 7, 2006
July 15 , 2006
|
6 weeks
4 weeks
|
Rack
Installation and wiring
|
|
|
install rack & wire sector 20
wire for bc1
|
Sep 1, 2006
Sep 1, 2006
|
1-week
1 week
|
Integration
System checkout
High pot
check polarity
software integration: trim,etc...
|
Oct
22, 2006
|
4-weeks
|
Injector
Commissioning
|
Jan 1, 2006
|
July 20, 2006
|
Reviews
|
Scheduled
Date
|
Status
|
SLC-Aware
IOC Functional Requirments Review
|
|
Done
|
SLC-Aware
IOC Design Review
|
|
Done
|
EPICS
Software Functional Requirements Review
|
|
Done
|
EPICS Software
Design
Review
|
April, 2006
|
|
Formal
Hardware Review for Injector/BC1
|
Mar 23, 2006
|
|
Formal
Software Design Review
|
July 13, 2006
|
|
Documentation
|
Start
Date
|
Num
of Weeks
|
Magnet
Controls Engineering Specification Documentent
|
|
|
Magnet
Controls and Fast Feedback Interface Control Document
|
|
|
Magnet
Controls and MPS Interface Control Document
|
|
|
Magnet
Controls and XAL Interface Control Document |
|
|
Magnet
Controls User's Guide
|
|
|
|
Software
Task
|
Start
Date
|
Num
of Weeks
|
Status
|
Assigned
|
|
SLC-Aware
|
|
|
|
|
|
Functional Requirements
|
|
|
Done
|
K.
Luchini
|
|
Design Review
|
|
|
Done
|
rodgin,saa,luchini
|
|
Write software
|
|
8-weeks
|
Done
|
D.
Rogind,luchini
|
|
Debug: Alpha <-> SLC Aware
|
|
6-weeks
|
Done
|
D.
Rogind
|
|
Testing: Alpha <-> SLC Aware
|
|
2-weeks
|
Done
|
D.
Rogind
|
|
Debug: EPICS <-> SLC Aware
|
Jun
21, 2005
|
4-weeks
|
|
D.
Rogind
|
|
Testing: EPICS<->Alpha
|
Jun 21, 2006
|
3-weeks
|
|
D. Rogind
|
|
EPICS Software
|
|
|
|
|
|
Functional Requirements
|
|
|
Done
|
K.
Luchini
|
|
Design Review
|
April 9, 2006
|
|
|
Luchini, Rogind
|
|
VME Analog Module Evaluation
|
Feb 21, 2006
|
1-week
|
in progress
|
K. Luchini
|
|
Test-Stand
|
Mar 8, 2006
|
|
|
K. Luchini
|
|
Software and VME setup
|
|
1-week
|
|
K. Luchini
|
|
EDM Displays
|
|
1-day
|
|
K. Luchini
|
|
Cable drawings
|
|
3-days
|
|
J. Dusatko
|
|
Build cables
|
|
2-days
|
|
M. Harms
|
|
MCOR
|
|
3-days
|
|
A. de Lira
|
|
Ethernet PS Controller
|
|
3-days
|
|
D. MacNair
|
|
Archiver
|
|
1-day
|
|
B. Hall
|
|
Driver
Support
|
|
|
|
|
|
Acromag IP-445
|
|
1-hour
|
done
|
S.
Allison
|
|
Acromag IP-440
|
|
1-hour
|
done
|
S.
Allison
|
|
AcromagAVME9670
|
|
1-hour
|
done
|
S.
Allison
|
|
EPSC
|
|
1-hour
|
done
|
S.
Allison
|
|
Acromag IP-231
|
|
1-hour
|
|
K.
Luchini
|
|
Hytec IP-ADC-8413
|
|
2-days
|
|
K.
Luchini
|
|
PLC EtherNet/IP
|
|
1-hour
|
done
|
S.
Schuh
|
|
Device Support
|
Nov 15,2006
|
1-week
|
|
K. Luchini
|
|
Diagnostic
|
|
|
|
|
|
SNL Sequences
|
|
|
|
|
|
Trim
|
Jun
8, 2006
|
2-week
|
done
|
D.
Rogind
|
|
Calibrate
|
Sep 1, 2006
|
2-week
|
|
D. Rogind
|
|
Standardize
|
Sep 21,2006
|
3-week
|
|
K. Luchini
|
|
Degaus (matlab)
|
Oct 10,2006
|
3-days
|
|
|
|
Debug
|
May 1, 2006
|
2-weeks
|
|
K. Luchini
|
|
System checkout
|
Oct 22,2006
|
2-week
|
|
K. Luchini
|
|
EPICS DB
|
|
|
|
|
|
Databases
|
Jan 3, 2006
|
4-weeks
|
|
S. Allison
|
|
Templates
|
Feb 15,2005
|
2-weeks
|
|
S. Allison
|
|
Database utilities
|
|
|
|
|
|
Channel
Archiver
|
Oct 15 2006
|
1-days
|
|
K. Luchini
|
|
Channel Watcher
|
Oct 15,2006
|
1-days
|
|
K. Luchini
|
|
Alarm Handler
|
Oct 15,2006
|
3-days
|
|
K. Luchini
|
|
Configuration
files
|
Nov 20,2006
|
1-week
|
|
K. Luchini
|
|
EDM Displays
Mockup Displays
Test Displays
|
May 2006
Jul 2006
|
|
2-weeks
1-week
|
D. Rogind
D. Rogind
|
|
Main Displays
|
Aug 2006
|
|
3-days
|
K. Luchini
|
|
Primary Diag
Displays
|
|
|
3-days
|
K. Luchini
|
|
Plots
|
Dec 2006
|
|
3-days
|
K. Luchini
|
|
Secondary Diag displays
|
Dec 2006
|
|
3-days
|
K. Luchini
|
|
Operator Help
- WIKI
|
Jan 2006
|
|
2-weeks
|
K. Luchini
|
|
SCP
Panels
|
Oct
2005
|
1-week
|
Done
|
N.
Spencer
|
|
SCP Help
|
|
1-days
|
|
K. Luchini
|
|
DB
Unit Num Spec
|
|
|
Done
|
S.
Allison
|
|
SLC DB
|
|
|
|
|
|
Test DB
|
Aug
2005
|
2-days
|
Done
|
N.
Spencer
|
|
Injector DB
|
Dec
2005
|
1-week
|
Done
|
N.
Spencer
|
|
BC1 DB
|
Dec
2005
|
3-days
|
Done
|
N.
Spencer
|
|
DBgen
|
Dec
2005
|
1-day
|
Done
|
K.
Underwood
|
|
DB edit: poly, hsta
|
Jan
3, 2006
|
1-day
|
on
hold
|
N.
Spencer
|
|
SLC Micro Mag
Job
|
Jul 2005
|
4-hours
|
Done
|
K. Underwood
|
|
Alpha Mag App
ACCESS
LGPS On/Off/Reset
LI21 Quad Switch Over
|
|
1 day
4-hours
4 -hours
|
Done
|
K. Underwood
K. Underwood
K. Underwood
|
|
Alpha Model
|
Aug 1,2006
|
4-weeks
|
|
M. Woodley
|
|
CA
Server Write Access
|
|
|
|
TBD
|
|
Pre-Installation
Checkout
|
Jul
24, 2006
|
4-weeks
|
|
K.
Luchini
|
|
Integration
System Checkout
|
Oct
22, 2006
|
3-weeks
|
|
K.
Luchini
|
|
|
|
|