PEPII and SPEAR Low Level RF Controls
Task List
Requirements
SPEAR RF Task List
EPICS ESD Task List
Index Task Comment Due Who 1 PPC Slot 0 Controller existing AB and VXI problems Mar03 luchini 2 Changes for SPEAR Mar03 saa 3 SLAC PEPII RFP Upgrade Dec luchini 4 SLAC PEPII IQA Upgrade Dec khkim 5 SLAC PEPII AIM Upgrade Dec lazmo 6 SLAC PEPII CLK Upgrade Done luchini 7 Fix bug that prevents upgrade past 3.13.1 sequence?, AB support? Mar03 lazmo 8 New Stations 12-5,12-6,SRF1 Done saa 9 Poll VXI Modules/Log Errors seq,dbs,disps,ALH 2003 ??? 10 Comb module reset during stn turn-on 0->THRU->0, seq,dbs 2003 ??? 11 Fault files not saving comb history HW problem? 2003 ??? 12 Auto delete of old FAULTOsc files by rfstates Still required? 2003 ??? 13 No freq tracking when integrator ON 2003 ??? 14 Show HVPS DCM INV_DATA as fault, not bad HW dbs,disps,ALH 2003 ??? 15 Ignore DCM status for color of IQA-based PVs disps 2003 ??? 16 Change freq tracking to check beam current? Need requirements 2003 ??? 17 Automatically turn woofer on/off? Need requirements 2003 ??? 18 Reread Comb module ISTT after it's cleared 2003 ??? 19 Matlab compiler work Jim Sebek's work into extensions 2003 luchini/saa 20 AB driver doesn't work if no VXI modules VXI driver problem 2003 luchini 21 RF state sequence dies when RFP calibration sequence exits 2003 ??? 22 Add all channels to RF configs And add SCP buttuns to run pre/post matlab scripts Dec ??? 23 More warnings in control loops when actuators close to saturation 2003 ??? 24 Automate comb filter constant update when # stations changes Need requirements 2003 ???
ESD Software Engineering | SLAC Computing | SLAC Detailed Home
EPICS at SLAC | PEPII Controls | NLC Dev Controls
Owner: Stephanie Allison
Contact: Kristi L. Luchini
Last modified: Wednesday, December 12, 2002