Status
8 June 2004
Note
compiler: J. Nelson
Contributors:
R Chestnut, R Hall, J Rock, D Rogind
SLED FDBK
through SCP slow feedback
(still true) Folks
keep turning it off. Not clear if it’s
the labview or the fdbk. BM works just
fine though … Janice
will make time to troubleshoot, perhaps not until after ITRP visit.
paoutdata
mat files compatible with matlab 7?
No news just yet. Matlab
7 coming end of summer.
SIS
waveforms archived every hour (plus on change)
done
MacNair
module support of aes
Debbie has it
working in the test closet. Next step is
to test signals or boot into TR06.
RMS/BIG
requirements for 8-packs structures: Ron gets to choose which is easier – one
loop for all MacNairs in tr09 and tr06, or one loop for each ioc
(Ron will
look or send to Janice) Will need to be able to archive the gain and set the
gain (internal to module). (potentially different for each module)
2-pack PLC coming in
October-ish.
(still true) ~20 signals as
yet undefined. Janice will ask for TP
printouts for this PLC too…
Plans for the future
(This is still true.) One or two 2-packs, plus
the work in these minutes. Is ˝
recent output a good estimate for the rest of the fiscal year? Ron will talk with Schultz and get back if
this isn’t a good estimate.
NLCTA/8-pack summary display
Trip rate for past 24 hrs. Ron’s gonna
think about it.
Reboot trips
NCLTA folks are building a circuit for the deadman and for the voltage inverter now. Anticipated installation
6/18.
Ron has a plan for something else to try. Probably ready for test in a few weeks –
kinda goes with:
About the change from subr records to sequence program
processing takes a few weeks to get the code ready and a week to test, when not
RF processing.
AFG driver code is done
(no new status)
Still waiting for Frisch to deliver an AFG.