Meeting
Minutes
27 Jan 2004
In
attendance: J Frisch, R Hall, J Nelson, J Rock, S Smith
Get list
from Joe/Steve for phase 2a signals (can be generated real time) this list will
allow for specification of the proc loop mods
SEE
ATTACHED LIST FROM JOE/MEETING
Timeline
for when modified channels are ready for February run (which ones are they, do
they require any software mods?)
NOT
GOING TO USE FOR FEB RUN
?DIO still
busted (SEEMS TO BE WORKING
FOR NOW)
SISDTZ
signal updates without archiving (NEED STATUS FROM RON)
macnair
module support of aes (NEED
STATUS FROM RON – DOES FULLER NEED TO READ FRONT PANEL SWITCHES?)
Janice
wants to mcaput values into proc loop fault counters. any foreseeable problems with this? ASK RON
Joe might
need a new DIO channel for watching RF faults (diode trip isn't enough?)
What we
want: as many as possible spare DIO outs (not in themiddle of in’s please) 2 we
know: sled vac out and kly vac out
Vac status
into proc loop (T off SAM->VMEADC, need to talk to porter etal)
NO NEW STATUS - OPS
epics display for plc vac analog display-
analog trip statuses don’t turn red.
Maybe just not reboot?
Judy will up its priority and Janice
will make a display (in her free time)
save/restore, /log, arch, alh – Is this
all done? YES!! YEAH!! Yeah, Judy!
Button from Terri for hard gateway reset
(I haven’t heard anything)
DB changes – reboot and watch messages
and request reboot soon after changes
Are we up to date with
Summary PVs for plc panels? ongoing
Dac attens in MW instead of volts: (from
last time) Ron found Steph’s clever solution and will look into what it takes
to implement for 8pack. NEED STATUS FROM RON – SEEMS LIKE WE’RE CANCELLING
THIS REQUEST
PLC checkout (eventually)
Newplc – WE NEED ALAN HILL’S HELP
Lack of multiple archbr’s on one window –
Ron Mackenzie – Janice will send email
to Ron asking what limits how many and what changed (we used to have 4) and
adding capability for just 2 is insufficient.
Is a faster machine needed (gtw04 nlcta and gtw05 for 8pack)?