8-pack To Do List
12/02/03 (in
attendance: Ron, Judy, Janice, Marc)
Last week’s list
with done items culled and new items added
# |
priority |
Thing to do |
Comments |
1 |
hi |
epics display for plc vac analog display- analog trip statuses don’t
turn red. Maybe just not reboot? |
Janice will watch |
1 |
hi |
AES support: -TR09 fails to find SIS
modules? |
Linda and Janice are
working on this. |
1 |
hi |
save/restore, /log, arch, alh |
Janice and Judy made a
long list for all displayed PVs what to do re:
save/restore, /log, archiving, and alh |
1 |
hi |
TR00 ok? |
Turns out problem in
driver due to modules JLN+LJH pulled out.
Ron will investigate |
2 |
med-hi |
SLED trickle |
Janice will ask for time
tomorrow to do the testing. |
3 |
med |
processing loop -need to spec vacuum check |
NLCTA Ops will make a
summary vac signal into the ADC Ron reported that 2 things
can be added easily to the loop, then it gets really tricky. |
3 |
med |
button from Terri for hard
gateway reset |
Janice will work with
Terri |
3 |
med |
Sort through Cassel’s new touch panel printouts, mod database and
panels as needed |
Janice counted 4 changes
(and there’s one more out there). |
3 |
med |
finish PLC based displays |
follows item above |
3 |
med |
Summary PVs (database) for displays |
follows item above |
3 |
med |
the dac_attenuators
in MW instead of volts |
Ron found Steph’s clever solution and will look into what it takes
to implement for 8pack. Elias is supposed
to be thinking about this also. |
3 |
med |
SIS support of LDREF
waveforms |
Judy needs the SIS channel
assignments from Steve |
3 |
med |
Why are vac readings from SCP yellow? |
Judy will continue to
investigate |
3 |
med |
finish propagating LDREF
signals through panels and database |
Judy will continue to work
on this |
4 |
med-lo |
PLC checkout (need all the
displays for this) |
follows PLC items above |
4 |
med-lo |
PLC-EPICS purple status |
Have we checked the PVs lately? |
5 |
lo |
Add all poly coef and smoo var to pack_adc_calib |
Judy has spec |
5 |
lo |
FONT- detach their SISes from the NLCTA readout loop |
Ron says this is coming
soon. |
6 |
for later |
Oracle – new version
12/29-1/1 |
Bob reported that the
oracle db admin will do this over the holidays. Marc said nlcta
will continue to run until 12/23. |
6 |
for later |
PV list for phase II. |
Ron said to give it to him
in Jan/Feb 2004. |
For
LLRF guys
Hardware Deadman
(from last time: Steve will test the hardware hook to RF chassis.)
Modify DIO module for mod on/off