8-pack To Do List

12/02/03 (in attendance: Ron, Judy, Janice, Marc)

Last week’s list with done items culled and new items added

 

 

#

priority

Thing to do

Comments

1

hi

epics display for plc vac analog display-

analog trip statuses don’t turn red.  Maybe just not reboot?

Janice will watch

1

hi

AES support:

-TR09 fails to find SIS modules?

 

Linda and Janice are working on this.

1

hi

save/restore, /log, arch, alh

Janice and Judy made a long list for all displayed PVs what to do re: save/restore, /log, archiving, and alh

1

hi

TR00 ok?

Turns out problem in driver due to modules JLN+LJH pulled out.  Ron will investigate

2

med-hi

SLED trickle

Janice will ask for time tomorrow to do the testing.

3

med

processing loop

-need to spec vacuum check

NLCTA Ops will make a summary vac signal into the ADC

Ron reported that 2 things can be added easily to the loop, then it gets really tricky.

3

med

button from Terri for hard gateway reset

Janice will work with Terri

3

med

Sort through Cassel’s new touch panel printouts, mod database and panels as needed

Janice counted 4 changes (and there’s one more out there).

3

med

finish PLC based displays

follows item above

3

med

Summary PVs (database) for displays

follows item above

3

med

the dac_attenuators in MW instead of volts

Ron found Steph’s clever solution and will look into what it takes to implement for 8pack.  Elias is supposed to be thinking about this also.

3

med

SIS support of LDREF waveforms

Judy needs the SIS channel assignments from Steve

3

med

Why are vac readings from SCP yellow?

Judy will continue to investigate

3

med

finish propagating LDREF signals through panels and database

Judy will continue to work on this

4

med-lo

PLC checkout (need all the displays for this)

follows PLC items above

4

med-lo

PLC-EPICS purple status

Have we checked the PVs lately?

5

lo

Add all poly coef and smoo var to pack_adc_calib

Judy has spec

5

lo

FONT- detach their SISes from the NLCTA readout loop

Ron says this is coming soon.

6

for later

Oracle – new version 12/29-1/1

Bob reported that the oracle db admin will do this over the holidays.  Marc said nlcta will continue to run until 12/23.

6

for later

PV list for phase II.

Ron said to give it to him in Jan/Feb 2004.

 

 

For LLRF guys

     Hardware Deadman (from last time: Steve will test the hardware hook to RF chassis.)

     Modify DIO module for mod on/off