PLS Liason Checklist (Summer run 2003)


This form should be filled out by the PLS Liason on a daily basis and printed to the Log book

[FrontPage Save Results Component]

Name

Date -- mm/dd/yy

Time


1. Flash:Ti Laser System

Longpulse on/off

On Off

LI00 ARRY 251 LONG_WAT (Ch.2)....W    SD/X%

LI00 ARRY 251 SLICE_uJ (Ch.3)....uJ   SD/X%

LI00 ARRY 251 SLICEHV_V (Ch.7)...V    SD/X%

LI00 ARRY 251 STKS2MES (Ch.9)....cts  SD/X%

LI00 TORO 488....................E+11 SD/X%

LGPS 1 LC00 BACT (MAXWELL).......V

AMPL3 LC00 VACT (SLICE HV/ctl)...V

CID:SPECT:PEAK...................nm

CID:SPECT:FWHM...................nm

MXWL__HV.........................kV

MXWL__CUR........................A

SIMR_CUR.........................A

THR_HTRV.........................V

THR_HTRI.........................A

THR_RESV.........................V

THR_RESI.........................A

THR_JIT..........................ns/100

THR_TIME.........................ns/100


2. Polarized Gun

LGUNCATV.........................V

LGUNCATI.........................E-6 A

GUN_TOTL.........................E-6 A

GUN_CATH.........................E-6 A

QE_Lock..........................%

Delta QE.........................%/24h

SF6 Analaog MOISTURE.............ppm

SF6 Analog O2_MON................% O2

VP386............................nTORR

Mass 28..........................pTORR

GUN_IN...........................deg C

GUN_OUT..........................deg C

ROOMTEMP.........................deg C

ROOMHUMI.........................%


3. E-Beam

Toroid 488 LI00 History MEAN.....E+11....Sigma..E+9

Time Interval for History Start..(date).......(time)

Time Interval for History Stop...(date).......(time)


4. Comments


Axel Brachmann
Revised: 07/11/03