Summer
Downtime Ideas 2004
updated 27 July 04
Talk topic suggestions:
Utilities Cooling tower and LCW systems for PEP, Linac,
DRs (op or EOIC)
- Electrical distribution
- Compressed Air
- DCS control system demo?
- Water systems
Beam Containment Architecture (Op or EOIC with help from Brian B. and
ADSO)
- Protection devices, shut-off paths, bypass features
MPS systems (2 ops or EOICs)
- VME based (new MPS)
- Abort systems
Artem/DeLamare/Fisher
- TIU
- Old MPS (e+, DRs)
- Timing system (2 ops or EOICs)
- PEP bucket jumps
- Diagnostics
- Architecture
- Linac PIOP, MKSU, PADs,
Fast time plots, Head-Tail
detectors (Op or EOIC)
- PEP RF (
Heinz,
Dmitry, Mike Browne)
Failure
mode samples
- Linac modulators
- Communication
- Electron cloud / Bunch patterns (Artem K,
Franz-Joseph D, Sasha N)
ask if worth talking about
- Tune Tracker, Interferometer, BxB Current Monitor,
New sync light monitor (Alan
Fisher) (project?)
- Fire Dept. emergency response (Don Locquaio)
- Emergency
Operations
Center
(Steve Mahaley)
- BaBar physics
- Injector beam dynamics (Op or EOIC + Jim T)PEP control & instrumentation
overview
- PPS modes and Stopper configurations -
Kristina
- PEP-II IP Orbit Control (Op or EOIC)
- BITBUS Magnet Control (AME)
- BaBar systems
- LCLS / SPPS
- NLCTA
- PEP plans for the future/coming
year (including unresolved problems)
- Elog roundtable
Projects:
Research, document and present one of the above topics
or