Summer Downtime Ideas 2002
updated 20 June 02
Talk topic suggestions:
· Utilities – Cooling tower and LCW systems for PEP, Linac, DR’s (op or EOIC)
· Electrical distributions
· Compressed Air
· “DCS” control system
· Beam Containment Architecture (Op or EOIC with help from Brian B. and ADSO)
· Protection devices, shut-off paths, bypass features
· MPS systems (2 ops or EOICs)
· VME based – (“new MPS”)
· Abort systems
· TIU
· Old MPS (e+, DRs)
· Timing system (2 ops or EOICs)
· PEP bucket jumps
· Diagnostics
· Architecture
· Klystron Diagnostics
· Linac – PIOP, MKSU, PADs, Head-Tail detectors (Op or EOIC)
· PEP RF – (Heinz, Dmitry, Mike Browne)
· Linac modulators
· BaBar Injection soft Abort/timer (expert)
· Electron cloud / Bunch patterns (Artem K, Franz-Joseph D, Sasha N)
· Tune Tracker, Interferometer, BxBm Current Monitor (Alan Fisher)
· Bunch length, beam size monitors (Robert Holzapple)
· Source Lasers (Axel B.)
· Overview
· Diagnostics
· Fire Dept. emergency response (Don Locquaio)
· Emergency Operations Center (Steve Mahaley)
· Linac Beam Loading (Franz-Joseph D.)
· Injector beam dynamics (Op or EOIC + Jim T)
· PPS modes and Stopper configurations
· PEPII IP Orbit Control (Op or EOIC)
· BITBUS Magnet Control (AME)
· CAMAC/Micros (Ralph J)
· BaBar systems
· SPPS
· Future of SLAC
· NLCTA (Marc R)
Projects:
Research, Document and present one of the above topics
or
· SPPS project – Sector 11 Chicane/bunch compressor
· LER injection TDC signal into SCP
· PEP Kicker signals into oscilloscope and video system
· MPS upgrades (Tilghman)
· RF and Timing diagnostics (Mike Browne)
· New PEP RF stations (Alan Hill)
· NLCTA software projects (Janice)
· BCS logic SCP displays (Mike Saleski) (similar to vacuum valve logic displays)
· Remote scope trace capture
· Update VAX and Control System Reference Manual
· Build HER and LER Injection Synchrotron Oscillation Monitor/Scope System
· Write help for LFB system
· Contribute to
ASO-2 training manual reference
· Think of ways to make the MCC library more useful. Update
inventory list.
· Update beam line maps
· Update safety inspection checklists
· Write/update MATLAB routines for PEP klystron fault files (Ron Akre)
See Note.
· Make scope signals accessible through internet (for experts helping remotely)
See Note.
· Improve usage of NI PCI-1409 frame grabber for MCC.
See Note.