LAST MODIFIED 02/25/03 |
|
|
|
|
|
|
|
|
|
|
|
|
COMP |
SYSTEM |
TASK |
PERSON RESP |
LOC |
GRP |
COM |
|
|
|
|
|
|
|
|
Mar-99 |
RF |
REVIEW TRANSITION DESIGN FOR CAVITY THICK
WINDOWS |
AKRE |
NDR |
KLY |
|
|
Apr-99 |
RF |
SET-UP GATED SWITCH FOR THE hp3589 OUTPUT TO
GROWLER |
KREJCIK/BROWN/PENNACCHI |
N/SDR |
CTL |
|
|
May-99 |
KICKER |
3 DEFECTIVE CERAMIC CHAMBERS FOR REPAIR |
HITEMP |
|
|
Jun-99 |
KICKER |
ORDER CAPTON SHEETS FOR WEDGES |
BONG |
|
AD |
|
|
Jun-99 |
RF |
FOCUS COIL MAGNET |
AKRE/STANGENES |
N/SDR |
KLY |
|
|
Jun-99 |
RF |
RF LONGER TIME-OUT FOR N/SREX PAU'S |
BROWNE |
N/SDR |
CTL |
|
|
Jul-99 |
DC MAGNET |
INVENTORY PERMANENT SEXTUPOLES |
BURROWS |
BLDG. 26 |
AD |
|
|
Jul-99 |
S.L.M. |
EARTHQUAKE CABINETS |
BRUNNER |
BLDG 020 |
SE&M |
|
|
Jul-99 |
RF |
BUILD SPARE VCO CHASSIS |
AKRE |
N/SDR |
KLY |
|
|
Aug-99 |
LOCK &TAG |
COLOR CODE ELECTRICAL BREAKERS BY AREA |
PENNACCHI |
BLDG 002/SECT. 1 |
AD |
|
|
Sep-99 |
DC MAGNET |
FABRICATE SPARE QW COILS |
GIANNINI |
BLDG. 26 |
MFD |
|
|
Sep-99 |
RF |
CHEMICAL ANALYSIS OF DAMAGED THICK CERAMIC
WINDOW |
E. HOYT/BONG |
NDR |
AD |
|
|
Sep-99 |
VACUUM |
FABRICATE CAVITY 811 SPOOL PIECE |
GIANNINI |
SDR |
MFD |
|
|
Oct-99 |
FACILITY |
CHECK SUMP DRAINAGE |
BURROWS |
TRAILER 284 |
AD |
|
|
Oct-99 |
FACILITY |
ROOF BLOCK TRAPS IN PLACE |
BURROWS |
BLDG'S 020 & 201 |
AD |
|
|
Oct-99 |
RF |
REVIEW TURN-OFF PROCEDURE OF KLY. HV P.S. WITH
INTERLOCKS |
AKRE |
N/SDR |
KLY |
|
|
Nov-99 |
FACILITY |
ARRANGE FOR REPAIR OF DR ALCOVE TARP |
BURROWS |
BLDG 002 |
AD |
|
|
Nov-99 |
KICKER |
REPAIR DAMAGED KICKER MAGNET |
GIANNINI |
BLDG 26 |
MFD |
|
|
Dec-99 |
BPM |
RECONFIGURE DR13 BPM254 |
KREJCIK/TRALLER |
NRTL |
CTL |
|
|
Dec-99 |
RF |
MODIFY PROCEDURE FOR PHASE RAMPING |
AKRE |
N/SDR |
KLY |
|
|
Dec-99 |
VACUUM |
RELOCATE VALVE CONTROLLER PANEL |
ROMERO |
NLTR |
PEI |
|
|
Dec-99 |
RF |
PENETRATION DRILLING |
CONTRACTOR/ROBINSON |
NDR |
SE&M |
|
|
Dec-99 |
RF |
KLY INTERLOCK UPGRADE |
AKRE/HILL |
NDR |
KLY |
|
|
Jan-00 |
KICKER |
BUILD NEW KICKER MAGNET |
J. ROBEAR |
BLDG 26 |
MFD |
|
|
Jan-00 |
RF |
QUOTE FROM VENDOR FOR 8 EACH CERAMIC WINDOW
SPINNINGS |
BURROWS |
NDR |
AD |
|
|
Feb-00 |
RF |
WRITE PURCHASE REQ. FOR SPINNIGS AFTER QWUOTE
IS RECEIVED |
BURROWS |
NDR |
AD |
|
|
Mar-00 |
KICKER |
TEST NEW MAGNET EKM-024 |
FERNANDEZ |
N/SDR |
PCE |
|
|
Apr-00 |
RF |
FABRICATE WEIR FOR SDR KLYSTRON |
ROMERO |
SDR |
SE&M |
|
|
|
Apr-00 |
KICKER |
REMOVE WEDGE FOR EKM-011 & INSTALL IN
EKM015 W/LIC |
BONG |
BLDG. 26 |
AD |
|
|
Dec-00 |
KICKER |
INSTALL LIC IN EKM-04 |
GIANNINI |
DR'S |
MFD |
|
Jun-01 |
CORRECTOR |
UPDATE LAYOUT DRAWING TO SHOW XCOR 951 |
BONG |
SRTL |
AD |
|
|
|
|
Jun-01 |
DC MAGNET |
INVENTORY DIPOLE COILS |
BURROWS |
DR'S |
AD |
|
|
|
|
Nov-01 |
DC MAGNET |
B080(1) & B1520(1) FABRICATE COILS WITH NEW
TERMINATION DESIGN |
GIANNINI |
S/NDR |
MFD |
|
|
|
|
Jan-02 |
KICKER |
KICKER THYRATRONS ON ORDER |
BEACH |
DR'S |
PCE |
2 THYRATRONS INSTALLED IN
THE NDR INJ KICKER- 10/01 RECEIVED 2 SPARE THYRATRONS ON 12/3/01. |
Feb-02 |
SEM |
PLACE
REQUEST TO HAVE COVER MADE FOR NDR FIRST ROOF BLOCK. |
ROBINSON |
NDR |
SE&M |
|
Jun-02 |
WATER |
INSTALL DRAIN LINE IN ALCOVE
RACKS FOR P.S. LCW |
ROBINSON |
DR ALCOVE |
SEM |
|
|
Jun-02 |
PROF MON |
FABRICATE SCREEN FOR SLTR PR073 |
WALTZ |
DRIP |
|
|
|
Jul-02 |
PROF MON |
FABRICATE PROF MON O73 |
GIANNINI |
DRIP |
MFD |
NOT INSTALLED IN BEAMLINE
YET. |
|
Jul-02 |
VACUUM |
THE SCHEDULE FOR THE NEW DRIP
CERAMIC CHAMBERS: |
BONG |
AD |
AD |
|
|
Jul-02 |
WATER |
MOVE RF LCW DEVICES OUT OF
CABINET |
ROBINSON |
NDR |
SEM |
|
|
Aug-02 |
DC MAGNET |
REPLACE SLTR FIGURE 8 QUAD COILS
THAT ARE DAMAGED |
GIANNINI |
SLTR |
MFD |
|
|
Aug-02 |
VACUUM |
REPLACE WAVEGUIDE SECTOR FOR
1-7B KLY |
GIANNINI |
KLY. GALL. |
MFD |
|
|
Aug-02 |
VACUUM |
INSTALL REPLACEMENT BELLOWS (B081) |
GIANNINI |
SRTL |
MFD |
REPLACED DURING DOWNTIME. |
|
Aug-02 |
VACUUM |
ORDER NEW BELLOWS JUST OF
UPSTREAM OF B081 |
BONG |
SRTL |
AD |
REPLACED DURING DOWNTIME. |
|
Sep-02 |
WATER |
UPGRADE PUMP PAD |
BRENKUS |
DR'S |
SEMO |
|
Nov-02 |
DC MAGNET |
FIND QD355 TRIM COILS |
BONG |
SLTR |
AD |
STORED IN BLDG.026 |
|
Nov-02 |
KICKER |
TEST BRAZE END PIECES FOR THE
LIC'S |
GIANNINI |
DR'S |
MFD |
|
Nov-02 |
KICKER |
ORDER MYCELEX FOR WEDGES |
BONG |
DR'S |
AD |
|
Feb-03 |
FACILITY |
LANDSCAPING FOR HILL BEHIND
TRAILER #284 |
|
TRAILER 284 |
|
6 SM. TREES PLANTED. |
|
|
ANALYZER |
TEK SPECTRUM ANALYZER 3052 NEEDS REPAIR |
KREJCIK |
NDR |
AD |
5K TO REPAIR-WHEN THE
FUNDS ARE AVAILABLE WILL REPAIR |
|
|
DC MAGNET |
DESIGN "Y" GIRDER DROP-OUT SUPPORTS |
BONG |
N/SDR |
AD |
WILL REVISIT AT A LATER
DATE |
|
|
DC MAGNET |
NEED TO WRITE A COMPUTER PROGRAM FOR THE
BACK-OUT STATION TO PERFORM A THERMAL
TEST ON THE TERMINATIONS FOR B1&B2. |
BONG |
DR'S |
MFD |
THERMAL TEST UNDERWAY IN
THE NLTR ON BEND 120. |
|
|
MAGNET |
REPLACE DAMAGED PERM. SEXTUPOLES |
GIANNINI |
DR'S |
MFD |
|
|
|
MAGNET |
FABRICATE BRASS RING INSERTS FOR PERM. MAGNETS |
GIANNINI |
DR'S |
MFD |
|
|
|
RF |
REPAIR HEAT EXCHANGER AS SPARE |
ROMERO |
DR'S |
SE&M |
HEAT EXCHANGER PULLED
FROM NDR |
|
|
RF |
PURCHASE REQ FOR FOCUS COILS |
AKRE |
DR'S |
KLY |
NEED MAGNET STEEL THEN
STANGENES CAN FAB. |
|
|
SCOPE |
PEPII
PLIC |
|
SDR |
|
|
|
|
WATER |
ROTATING SCHEDULE FOR THE LCW
FILTERS |
ROMERO |
SEMO |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|