LAST MODIFIED 02/25/2003
SYSTEM TASK PERSON RESPONSIBLE LOCATION GROUP COMMENT COMPLETION DATE REVIEW DATE        
DC MAGNET 2 SETS OF DIPOLE COILS FOR    PBL &PBR BONG DRIP AD
DC MAGNET TEST EMHP FOR SLTR FIG. 8 QUADS FOR GROUND CURRENT PROBLEM CRAFT DRIP AMW ON ROD LIST
DC MAGNET INSTALL THERMAL TABS ON  QF 1065 & QD 1085 TO COMPARE TEMPS. BONG SLTR AD
DC MAGNET INTERLOCK LGPS & INDIVIDUAL QUADS FOR LCW FLOW LAPARI/CTL DR PCE/CTL
DIAGNOSTIC INVESTIGATE SCOPE OPTIONS  YEE/BURROWS DR'S CTL
FACILITY QUARTERLY INSPECTIONS BURROWS DR'S AD
FACILITY PC FOR THE DR TRAILER DEBARGER DR'S AD
KICKER X-MOVER FOR THE INJ. FOR ALIGNMENT BONG SDR AD
KICKER FABRICATE WEDGES FOR MAGNETS GIANNINI DR'S MFD 2 WEDGES COMPLETE
KICKER SEND LIC'S TO BE METALIZED BONG DR'S AD
KICKER ORDER SPINNINGS FOR LIC'S BONG DR'S AD CHECK INVENTORY
KICKER BRAZE END PIECES ON LIC'S GIANNINI DR'S MFD
KICKER 4 EACH LIC'S ON ORDER BONG DR'S AD 8/23/01 BUYER CALLED VENDOR. VENDOR IS WORKING ON QUOTE. PO DATE 8/6/01.
PROF MON CONTROLS & CAMERA FOR PROFMON 073 BROWN SRTL CTL IN PROGRESS NEED ACCESS
SLM DUST COVERS FOR MIRRORS BONG DR'S AD
SLM SOUNDPROOF UPSTAIRS TABLE ASSEM. BURROWS DR'S AD
SOFTWARE ADD 4 BUTTONS TO SCP TO TURN OFF ALL ELECTRICAL POWER UNDERWOOD DR CTL IN DEVELOPMENT
VACUUM FABRICATE MATCHING CHAMBER  PART BONG DR'S AD
VACUUM REPLACE MC 160 GIANNINI NDR MFD
VACUUM REPLACE VG 643 GIANNINI SDR MFD
VACUUM LOCATE EXTRUSION OR BELLOWS FOR NRTL B690 VAC. CHAMBER BONG NRTL AD
VACUUM REPLACE NRTL B690 CHAMBER GIANNINI NRTL MFD
WATER WHAT SIZE ARE THE GIRDER LCW MANIFOLDS SHIN SLTR SE&M
WATER WHAT ARE THE LCW MANIFOLD PRESSURES ROMERO SLTR SEMO FIRST SLTR THEN NRTL
WATER WHAT ARE THE COMPONENT DESIGN LCW FLOWS SPENCER, C. DR'S NLC
WATER WHAT TYPES OF FLOW RESTRICTORS ARE THERE FOR LCW DEVICES SHIN DR'S SE&M BONG THINKS FIXED ORIFICE FLOW RESTRICTOR SHOULD BE USED.