| LAST MODIFIED 02/25/2003 | |||||||||||
| SYSTEM | TASK | PERSON RESPONSIBLE | LOCATION | GROUP | COMMENT | COMPLETION DATE | REVIEW DATE | ||||
| DC MAGNET | 2 SETS OF DIPOLE COILS FOR PBL &PBR | BONG | DRIP | AD | |||||||
| DC MAGNET | TEST EMHP FOR SLTR FIG. 8 QUADS FOR GROUND CURRENT PROBLEM | CRAFT | DRIP | AMW | ON ROD LIST | ||||||
| DC MAGNET | INSTALL THERMAL TABS ON QF 1065 & QD 1085 TO COMPARE TEMPS. | BONG | SLTR | AD | |||||||
| DC MAGNET | INTERLOCK LGPS & INDIVIDUAL QUADS FOR LCW FLOW | LAPARI/CTL | DR | PCE/CTL | |||||||
| DIAGNOSTIC | INVESTIGATE SCOPE OPTIONS | YEE/BURROWS | DR'S | CTL | |||||||
| FACILITY | QUARTERLY INSPECTIONS | BURROWS | DR'S | AD | |||||||
| FACILITY | PC FOR THE DR TRAILER | DEBARGER | DR'S | AD | |||||||
| KICKER | X-MOVER FOR THE INJ. FOR ALIGNMENT | BONG | SDR | AD | |||||||
| KICKER | FABRICATE WEDGES FOR MAGNETS | GIANNINI | DR'S | MFD | 2 WEDGES COMPLETE | ||||||
| KICKER | SEND LIC'S TO BE METALIZED | BONG | DR'S | AD | |||||||
| KICKER | ORDER SPINNINGS FOR LIC'S | BONG | DR'S | AD | CHECK INVENTORY | ||||||
| KICKER | BRAZE END PIECES ON LIC'S | GIANNINI | DR'S | MFD | |||||||
| KICKER | 4 EACH LIC'S ON ORDER | BONG | DR'S | AD | 8/23/01 BUYER CALLED VENDOR. VENDOR IS WORKING ON QUOTE. PO DATE 8/6/01. | ||||||
| PROF MON | CONTROLS & CAMERA FOR PROFMON 073 | BROWN | SRTL | CTL | IN PROGRESS NEED ACCESS | ||||||
| SLM | DUST COVERS FOR MIRRORS | BONG | DR'S | AD | |||||||
| SLM | SOUNDPROOF UPSTAIRS TABLE ASSEM. | BURROWS | DR'S | AD | |||||||
| SOFTWARE | ADD 4 BUTTONS TO SCP TO TURN OFF ALL ELECTRICAL POWER | UNDERWOOD | DR | CTL | IN DEVELOPMENT | ||||||
| VACUUM | FABRICATE MATCHING CHAMBER PART | BONG | DR'S | AD | |||||||
| VACUUM | REPLACE MC 160 | GIANNINI | NDR | MFD | |||||||
| VACUUM | REPLACE VG 643 | GIANNINI | SDR | MFD | |||||||
| VACUUM | LOCATE EXTRUSION OR BELLOWS FOR NRTL B690 VAC. CHAMBER | BONG | NRTL | AD | |||||||
| VACUUM | REPLACE NRTL B690 CHAMBER | GIANNINI | NRTL | MFD | |||||||
| WATER | WHAT SIZE ARE THE GIRDER LCW MANIFOLDS | SHIN | SLTR | SE&M | |||||||
| WATER | WHAT ARE THE LCW MANIFOLD PRESSURES | ROMERO | SLTR | SEMO | FIRST SLTR THEN NRTL | ||||||
| WATER | WHAT ARE THE COMPONENT DESIGN LCW FLOWS | SPENCER, C. | DR'S | NLC | |||||||
| WATER | WHAT TYPES OF FLOW RESTRICTORS ARE THERE FOR LCW DEVICES | SHIN | DR'S | SE&M | BONG THINKS FIXED ORIFICE FLOW RESTRICTOR SHOULD BE USED. | ||||||