S20 Injector PED Weekly Meeting
Wednesday, Nov. 13th, 09:00 am, POM/FLORA
Room in B280.
Note the change in meeting time and room. We
want to use the computer projector in the POM/FLORA Room, but the room is
already committed at 10:30. Please let me know if this meeting time is
impossible for you.
1. Review of CD2A goals. The latest version is at Drop
Boxes/Clendenin.
2. Completed-drawings exercise. The format for the drawings list has been
slightly revised (some of the columns renamed). Check the current version of
Inj_dwg.xls in Drop Boxes/Clendenin/Sub-group input folders. Discussion of
procedure to estimate total number of drawings required to finish injector PED.
3. Review of long lead items. The LongLeadItems.xls file in Drop
Boxes/Clendenin has been revised (see 021106 version). The Required Lead Times
probably need additional revision.
4. Load-lock/gun PED start up plans. Dowell/Boyce
Electron beam layout: what to do? (CD2A goal)
Dowell etc.
Future meetings:
Nov. 20. Laser system PED review.
Scope (laser design, laser room layout, etc.);
role of Laser Advisory Committee (LAC), input from
Laser Workshop, etc.
Bolton
Nov. 27. No meeting.
Dec. 4. 1) Electrooptic device plans. Dowell
2) Final decision on drawings-documentation format (CD2A goal).
Dec. 11. 1) RF FF. Akre/Schmerge
2) RF source. Akre
Relevant files at winsan1/groups/Ad/Drop
Boxes/Clendenin .