After a recovery from the vacuum leak of the interaction region beam pipe, KEKB resumed its operation in January and is now running quite well. Members of Belle and KEKB groups have started designing a major luminosity upgrade (Super KEKB) aimed at a luminosity of 10**35 - 10**36 cm-2s-1 This talk will cover the recent status of Belle/KEKB running and the plan for the Super KEKB upgrade; physics, detector and accelerator issues.