Shift log activities: Day,
Swing
See Run
database for run ranges 135002061-135002090 for run config/data
details
Tower A at grid 0: TkrFMA, CAL FM104
Tower B at grid 4: TkrFMB, CAL FM105
Muon telescope vertically over tower B
Tower A always in standard configuration. Tower B layer combinations
varied.
Run | STRETCH_OR | Tower B Layers | Results/Comments |
Stretch_OR delay and rate tests with Tower B alone *: | |||
135002061 | 0 | All | TKR&EXT=74+-3% TreqTKR=10.2+-0.03 |
135002062 | 1 | All | TKR&EXT=20% TreqTKR=9.9 |
135002063 | 31 | All | TKR&EXT=73% TreqTKR=10.2 |
135002067 | 0 | All | set GTRC csr LD_stretch bit=0. No effect. |
135002068 | 0 | 0,1,2 | TKR&EXT=56% TreqTKR=11.8 |
135002069 | 4 | 0,1,2 | TKR&EXT=36% TreqTKR=11.1 |
135002070 | 2 | 0,1,2 | TKR&EXT=14% TreqTKR=10.6 |
135002071 | 6 | 0,1,2 | TKR&EXT=49% TreqTKR=11.2 |
135002072 | 8 | 0,1,2 | TKR&EXT=52% TreqTKR=11.6 |
135002073 | 10 | 0,1,2 | TKR&EXT=58% TreqTKR=11.5 |
135002074 | 12 | 0,1,2 | TKR&EXT=59% TreqTKR=11.5 |
Stretch_OR efficiency tests with two towers **: |
|||
135002064 | 0 | 0,1,2 | |
135002065 | 31 | 0,1,2 | Ended abnormally with many TEM errors. |
135002076 | 4 | 0,1,2 | |
135002077 | 12 | 0,1,2 | Ended with many TEM,TrgParity errors. |
135002079 | 12 | 0,1,2 | Redo |
135002080 | 0 | 15,16,17 | |
135002092 | 4 | 15,16,17 | |
135002093 | 12 | 15,16,17 | |
135002095 | 0 | 8,9,10 | Many TEM errors towards end of run. |
135002101 | 4 | 8,9,10 | After power cycle TEM. Enabled tower B busy. |
135002102 | 12 | 8,9,10 |
* Stretch_OR delay and rate tests used single tower Time_in script with all Treq delays=0. GEM win=31. CAL TACK=24.
** Efficiency runs setting based on two tower tests below:
TKR Treq=3,4; CAL Treq=0,0; EXT Treq=14; TKR TACK=0; CAL TACK=44,45 GEM WIN=12.
One-shot Tests ***: | ||||
Run | Type | Stretch_Or | Periodic dT | Comments |
135002081 | Qinj doublet | 0 | 550 | Half of events had TEM errors |
135002082 | Qinj doublet | 0 | 850 | |
135002083 | Qinj doublet | 0 | 900 | |
135002084 | Qinj doublet | 0 | 950 | |
135002085 | Qinj doublet | 12 | 550 | Half event TEM errors again. |
135002086 | Qinj doublet | 12 | 850 | |
135002087 | Qinj doublet | 12 | 700 | TEM errors. |
135002088 | Qinj doublet | 0 | 700 | TEM errors. |
135002089 | 1 Qinj + TKR trig | 0 | N/A | Qinj at 100Hz |
135002090 | 1 Qinj + TKR trig | 12 | N/A |
*** One-shot tests are performed with both towers on. 1 channel per GTFE Qinj
DAC=63 (~5 MIPs). Using periodic trigger doublet to drive tests at 10Hz. Also
performed single Qinj and Tower B TEM busy enable was not set for all the runs.
TKR TACK=40; CAL TACK=90.