Description
|
Submitted By
|
Date
|
Format
|
ACD PhotoMultiplierTube Glass Failure
|
Michael Amato
|
April 9, 2004
|
PDF
|
ACD Decision to Use GAFE Version 7
|
Mike Amato
|
March 4, 2004
|
PDF
|
ACD Mass Estimate (LAT-TD-00564-10)
|
Mike Amato
|
March 4, 2004
|
PDF
|
ACD Trade Decision Comment - Shield between FREE boards
|
Mike Amato
|
January 21, 2004
|
PDF
|
ACD x Side Connector Flip and LAT Harness Running Space Shortage Trade Study Summary
|
Mike Amato
|
January 21, 2004
|
PDF
|
ACD PMT 0046 Engineering Unit Failure Issue Summary and Status
|
Mike Amato
|
January 21, 2004
|
PDF
|
PMT Failure Analysis Mechanical Model Matrix
|
Mike Amato
|
January 21, 2004
|
PDF
|
TDA Flexure to Fiber Gap Margin and Interface Problem Trade Study Summary Draft
|
Mike Amato
|
January 21, 2004
|
PDF
|
LAT ACD Subsystem Specification - Level III Specification (Old)
|
Mike Amato
|
August 24, 2003
|
PDF
|
TDA to PMT Mapping, Rev 2.3
|
George Shiblie
|
Apr 29, 2003
|
PDF
|
Rationale for Flow of the ACD Reliability Requirement to the Micromerteoroid Shield Requirement
(LAT-TD-01591-01)
|
Dave Thompson
|
Feb 25, 2003
|
PDF
|
ACD Monitoring Needs Table
|
George Shiblie
|
Feb 13, 2002
|
PDF
|
ACD Power Estimates
|
Dave Thompson
|
Dec 30, 2002
|
PDF
|
ACD-LAT Interface Definition Drawings
|
Mike Amato
|
Oct 31, 2002
|
PDF
|
ACD-LAT Mechanical, Electrical & Thermal ICD
|
Mike Amato
|
Oct 31, 2002
|
ACD-CM
|
Trade study summary-justification for moving back to 2 HVBS per FREE board
|
Mike Amato
|
Mar 20, 2002
|
PDF
|
LAT ACD Subsystem Spec - Level IV Requirements/specifications
|
Mike Amato
|
Feb 20, 2002
|
ACD-CM
|
DCN for LAT ACD Subsystem Specification - Level III Specification
|
Mike Amato
|
Feb 08, 2002
|
PDF
|
Last Updated: May 20, 2004