Image and Description
|
Submitted By
|
Date
|
ACD in Thermal Vacuum Test Chamber
|
D. Thompson
|
July 22, 2005
|
ACD Being Installed on its Thermal Vacuum Fixture
|
Tom Johnson
|
July 20, 2005
|
ACD Vibration Test Video
|
D. Thompson
|
July 20, 2005
|
The ACD Assembly Sequence
|
D. Thompson
|
July 18, 2005
|
The ACD and the MicroMeteoroid Shield
|
D. Thompson
|
July 15, 2005
|
The Full ACD
|
D. Thompson
|
June 9, 2005
|
Qualification Electronics Chassis
|
D. Thompson
|
Aug 4, 2004
|
GLAST Emblem Plaque
|
D. Thompson
|
July 21, 2004
|
ACD Electronics Chassis
|
D. Thompson
|
July 14, 2004
|
ACD Mechanical Structure
|
D. Thompson
|
July 14, 2004
|
Base Frame Assembly
|
D. Thompson
|
March 22, 2004
|
ACD Tile Shell Assembly Status - March 19
|
D. Thompson
|
March 19, 2004
|
Photomultiplier Tube Assembly Facility
|
D. Thompson
|
October 16, 2003
|
The ACD Team Members
|
D. Thompson
|
September 25, 2003
|
Engineering Model Electronics Chassis - used for fit checking of phototubes, high voltage bias supplies, and FREE cards.
|
D. Thompson
|
July 9, 2003
|
ACD Scintillating Fiber Ribbons - Assembly of an ACD scintillating fiber ribbon and bending fixture for ACD scintillating fiber ribbons.
|
D. Thompson
|
Apr 25, 2003
|
FREE Card - ACD Front End Electronics (FREE) Card - Development Unit
|
D. Thompson
|
Jan 14, 2003
|
Thermal Vacuum Test Set Up - Thermal Vacuum test set up for three Tile Detector Assemblies (TDA's) along with four PMT/Resistor Network assemblies. Note that two of the three TDA's are mounted to a flight like mechanical structure.
|
Tom Johnson
|
Dec 2, 2002
|
Z-axis Vibration Test Set Up - This is a picture of the Z-axis vibration test set up for the 4 PMT/Resistor Network (RN) assemblies. Three Tile Detector Assemblies (TDA's) are attached to the 4 PMT/RN assemblies via clear fiber cables.
|
Tom Johnson
|
Dec 2, 2002
|
Hypervelocity Test - Micrometeoroid Shield Test - Preliminary Photos. These snapshots were taken during testing at Rice University on October 7-8, 2002
|
D. Thompson
|
Oct 15, 2002
|
ACD Fiber Routing Mock-up Details
|
D. Thompson
|
Mar 27, 2002
|
ACD Fiber Routing Mock-up
|
D. Thompson
|
Mar 27, 2002
|
ACD Prototype Tile Assembly
|
D. Thompson
|
Mar 6, 2002
|
ACD Support Shell
|
D. Thompson
|
Mar 6, 2002
|
ACD Tower - ACD Tower with all tiles attached.
|
D. Thompson
|
Feb. 14, 2000
|
Curved Tile - Curved tile for the top of the tower.
|
D. Thompson
|
Feb. 14, 2000
|
ACD Tower - ACD Tower for the Beam Test
|
D. Thompson
|
Nov. 18, 1999
|
ACD Stack - ACD Beam Test Stack
|
D. Thompson
|
Nov. 18, 1999
|
ACD Electronics Board - ACD Beam Test electronics board.
|
D. Thompson
|
Nov. 18, 1999
|
Testing the ACD Electronics - Testing of the ACD electronics for the 1999 SLAC Beam Test
|
Jeff Silvis
|
Oct. 11, 1999
|
ACD Electronics Board - One of six ACD electronics boards.
|
Jeff Silvis
|
Oct. 11, 1999
|
Beam Test Scintillator - Scintillator tiles for beam test with waveshifting fibers (two configurations).
|
D. Thompson
|
July 13, 1999
|
Beam Test Tile - Scintillator tile for beam test ACD.
|
D. Thompson
|
July 6, 1999
|
Beam Test Frame - Structural frame for beam test ACD.
|
D. Thompson
|
July 6, 1999
|
Last Updated: August 22, 2005