Images
Image and Description Submitted By Date
ACD in Thermal Vacuum Test Chamber D. Thompson July 22, 2005
ACD Being Installed on its Thermal Vacuum Fixture Tom Johnson July 20, 2005
ACD Vibration Test Video D. Thompson July 20, 2005
The ACD Assembly Sequence D. Thompson July 18, 2005
The ACD and the MicroMeteoroid Shield D. Thompson July 15, 2005
The Full ACD D. Thompson June 9, 2005
Qualification Electronics Chassis D. Thompson Aug 4, 2004
GLAST Emblem Plaque D. Thompson July 21, 2004
ACD Electronics Chassis D. Thompson July 14, 2004
ACD Mechanical Structure D. Thompson July 14, 2004
Base Frame Assembly D. Thompson March 22, 2004
ACD Tile Shell Assembly Status - March 19 D. Thompson March 19, 2004
Photomultiplier Tube Assembly Facility D. Thompson October 16, 2003
The ACD Team Members D. Thompson September 25, 2003
Engineering Model Electronics Chassis - used for fit checking of phototubes, high voltage bias supplies, and FREE cards. D. Thompson July 9, 2003
ACD Scintillating Fiber Ribbons - Assembly of an ACD scintillating fiber ribbon and bending fixture for ACD scintillating fiber ribbons. D. Thompson Apr 25, 2003
FREE Card - ACD Front End Electronics (FREE) Card - Development Unit D. Thompson Jan 14, 2003
Thermal Vacuum Test Set Up - Thermal Vacuum test set up for three Tile Detector Assemblies (TDA's) along with four PMT/Resistor Network assemblies. Note that two of the three TDA's are mounted to a flight like mechanical structure. Tom Johnson Dec 2, 2002
Z-axis Vibration Test Set Up - This is a picture of the Z-axis vibration test set up for the 4 PMT/Resistor Network (RN) assemblies. Three Tile Detector Assemblies (TDA's) are attached to the 4 PMT/RN assemblies via clear fiber cables. Tom Johnson Dec 2, 2002
Hypervelocity Test - Micrometeoroid Shield Test - Preliminary Photos. These snapshots were taken during testing at Rice University on October 7-8, 2002 D. Thompson Oct 15, 2002
ACD Fiber Routing Mock-up Details D. Thompson Mar 27, 2002
ACD Fiber Routing Mock-up D. Thompson Mar 27, 2002
ACD Prototype Tile Assembly D. Thompson Mar 6, 2002
ACD Support Shell D. Thompson Mar 6, 2002
ACD Tower - ACD Tower with all tiles attached. D. Thompson Feb. 14, 2000
Curved Tile - Curved tile for the top of the tower. D. Thompson Feb. 14, 2000
ACD Tower - ACD Tower for the Beam Test D. Thompson Nov. 18, 1999
ACD Stack - ACD Beam Test Stack D. Thompson Nov. 18, 1999
ACD Electronics Board - ACD Beam Test electronics board. D. Thompson Nov. 18, 1999
Testing the ACD Electronics - Testing of the ACD electronics for the 1999 SLAC Beam Test Jeff Silvis Oct. 11, 1999
ACD Electronics Board - One of six ACD electronics boards. Jeff Silvis Oct. 11, 1999
Beam Test Scintillator - Scintillator tiles for beam test with waveshifting fibers (two configurations). D. Thompson July 13, 1999
Beam Test Tile - Scintillator tile for beam test ACD. D. Thompson July 6, 1999
Beam Test Frame - Structural frame for beam test ACD. D. Thompson July 6, 1999
Last Updated: August 22, 2005