    1. entry into FFTB to look at undulator equipment (JCS,AM,KM)
    2. beam tuning (RI)

    28 GeV E166 FFTB design optics loaded

    clean beam to FFTB dump, PLIC signal close to zero. Main change was to raise the beam by a few mm in the last three FFTB BPMs and set phase ramp to -4.1 degree looking the dump WS

    3. seem that BPM 6130 needsa to be raised by several mm

    4. OTR doesn't move

    5. IC 6132 seems to be reading a factor of 100 less IC6170

    6. logbook does not want to grap SCP pictures