User name Vinod
Log entry time 14:29:39 on October 9,2004
Entry number 23
keyword=day shift summary
1. access into FFTB to look at undulator equipment (JCS, AM & KM)
2. beam tuning (Iverson)
clean beam to the dump, PLIC signal less than 2 (no beam loss)
moved phase ramp -5 degree, steered the beam up a few mm on the last three BPMs in the FFTB.
FIGURE 1
FIGURE 2