Present: Peter Bosted, Don Crabb, Keith Griffioen, Bill Olson, Steve Rock, John Weisend Compton target: Don looking into Oxygen. Might need liguid helium tmp. Nothing else look too good, compared to iron. Compton Polarimeter: Peter did more simulations with single electrons and iron target. Looks reasonable. Sent to Yerevan so they can compare with their studies. Photon Beam: layout proceding. C37 may get moved down-beam a few meters to accomodate dump magnets. Roger looking into using a 3-deg magnet (like A-line) for sweep magnet. Perry, Zen, other starting to meet every Thursday to work on goniometer commisioning. E160 target: would like computer computer control. Detailed design beginning. E160 physics: Miao Wang (slowly) getting started on fitting inelastic J/psi data. E161 target heating: Don, Peter both get about 22 mW for 1E9 photons. Worry about many low energy photons from crystal (channeling, etc.) that could cause additional heating. S. African group is considering doing more detailed study with Geant. E160 Geant simulatons: Eugene hasn't started yet. Meanwhile, Piotr found two bugs. Peter re-ran simulations: finds less background of pions and protons, which may allow less shielding and better resolution. Collaboration meeting: next one should be in early June.