Proceedings of the 7th International Workshop

on Accelerator Alignment

(IWAA 2002)

11-14 November 2002, SPring-8, Japan

eConf C0211115
  • Status Reports From Accelerator Facilities Around the World
  • Alignment Instrumentation, Software and Methods
  • Metrology Aspects of Physics Installations, Photon Beamline Components, Experiments and Detectors
  • HLS (Hydrostatic Leveling System) and BBA (Beam Based Alignment)
  • Alignment Topics Pertaining to Linear Colliders, Ground Motion, 4th Generation Light
  • Poster Session
  • Appendix
  • Status Reports From Accelerator Facilities Around the World

    H. Tanaka: Beam Orbit Stabilization at the SPring-8 Storage Ring  

    G. Neubauer: TESLA - a Challenge in Planning Large Facilities  

    K. Mishima: Survey and Alignment of the Medical Accelerator PATRO at HIBMC  

    F. Q. Wei: Status of the SLS Alignment System  

    C. Le Cocq: Status Report on the Alignment Activities at SLAC  

    N. Sanguansak: Realignment Magnets of Siam Photon Source Storage Ring  

    H. Friedsam: Advanced Photon Source - Upgrades and Improvements  

    C. J. Curtis: Review of Alignment Activities at Jefferson Lab  

    R. Sugahara: Status of KEKB  

    J. Prenting: Status Report on the Survey and Alignment of Accelerators and Storage Rings at DESY  

    M. Mayoud: Metrology and Surveying at CERN: Recent News and Facts  

    --return to top--

    Alignment Instrumentation, Software and Methods

    X. He: Adjustment of the Linac and Transport Line of NSRL  

    K. Man: Survey and Alignment of HIRFL-CSR at IMP  

    Y. Kirochkin: On the Influence of the Measurement Biases at the Accelerator Alignment  

    K. Endo: Eigenvalue Problem in Precise Magnet Alignment

    S. Matsui: Alignment Method for 50m Distance Using Laser and CCD Camera  

    P. A. Coe: Frequency Scanning Interferometry - a Versatile, High Precision, Multiple Distance Measurement Technique  

    D. Martin: Instrumentation and Calibration at the ESRF  

    S. M. Gibson: A Study of Geodetic Grids for the Continuous, Quasi Real Time Alignment of the ATLAS Semiconductor Tracker  

    M. Jones: Geodetic Parameterization of the CNGS Project  

    B. O'Sheg Oshinowo: Survey and Alignment of the Fermilab MiniBooNE Experiment  

    K. Tsumaki: Magnet Alignment Method, Alignment Results and Closed Orbit Distortion for the SPring-8 Storage Ring  

    W. Coosemans: The Alignment of the LHC Low Beta Triplets : Review of Instrumentation and Methods  

    L. Langer: Bringing COM Technology to Alignment Software  

    P. Arce: 0bject 0riented Software for Simulation and Reconstruction of Big Alignment Systems  

    --return to top--

    Metrology Aspects of Physics Installations, Photon Beamline Components, Experiments and Detectors

    C. Amelung: The Alignment System of the ATLAS Muon Spectrometer  

    D. P. Sanderson: 3-D Measurement of the NSCL Position-Sensitive Gamma Ray Detector Array  

    H. Aoyagi: Alignment of Photon Beamline Components of the SPring-8 Front End  

    M. Masuzawa: Circumference Variations Observed at KEKB  

    D. Dong: Study of Charged Particle Storage Ring as Detector of Gravitational Waves  

    --return to top--

    HLS (Hydrostatic Leveling System) and BBA (Beam Based Alignment)

    C. Zhang: Primary Hydrokinetics Study and Experiment on the Hydrostatic Leveling System  

    D. Martin: The European Synchrotron Radiation Facility Hydrostatic Leveling System - Twelve Years Experience With a Large Scale Hydrostatic Leveling System  

    F. Becker: Consequences of Perturbations of the Gravity Field on HLS Measurements  

    M. Schloesser: High Precision Survey and Alignment of Large Linear Colliders - Vertical Alignment  

    --return to top--

    Alignment Topics Pertaining to Linear Colliders, Ground Motion, 4th Generation Light Sources and Related Facilities

    F. Jin: Dynamic Pattern Recognition of Accelerator Facilities  

    A. Araya: Ground Noise Studies Using the TAMA300 Gravitational-Wave Detector and Related Highly-Sensitive Instruments  

    K. Tada: FEM Analysis on the Slow Ground Motion  

    H. Yoshioka: An Active Microvibration Isolation System  

    J. Prenting: TESLA - the Range of Survey and Alignment Work  

    A. Herty: High Precision Survey and Alignment of Large Linear Colliders - Horizontal Alignment  

    W. Benecke: TTF - the Way to TESLA  

    R. Bingham: The Linear Collider Alignment and Survey (LiCAS) Project  

    --return to top--

    Poster Session

    X. Ouyang: Survey and Alignment for the BEPCII Storage Ring  

    I. Pschorn: The GSI Future Project : an International Accelerator Facility for Beams of Ions and Antiprotons  

    D. Behrend: GPS Activities at SLAC  

    K. Dreyer: Alignment of Storage Ring Magnets at SLS  

    B. Fuss: 3D Arcing for Offset Measurements with a Hamar Laser  

    M. Gaydosh: WinGEONET : What's New?  

    M. Ikegami: Development of a Laser-Based Alignment System for the J-Parc Linac  

    N. Levet: Optimization of the ESRF Storage Ring Level Survey and Network  

    K. Mishima: The Method of the Design for Survey Network by Q Matrices  

    H. Duparz: High Precision Alignment for the HISTAR Project  

    F. Derie: The VLT Delay Line Rails Alignment System by FOGALE Nanotech  

    F. Ossart: The FOGALE Nanotech Technology for Accelerator Alignment  

    B. O'Sheg Oshinowo: Survey and Alignment of the Fermilab D0 Detector : From Assembly to Roll-in  

    J. Penicka: New Database Design for the APS Survey and Alignment Data  

    J-L. Pochon: The Surveying and Alignment for the PROSCAN Project  

    S. Takeda: Basic Alignment System for SCSS  

    K. Tremblay: ACAMS - Integrated Software for Accelerator Alignment and Measurement  

    K. Tsumaki: Magnet Rearrangement for 30 m Long Straight Sections in the SPring-8 Storage Ring  

    D. Missiaen: The Metrology of LHC Components Prior to Their Installation in the Tunnel  

    A. Herty: Next Generation of Linear Accelerators - High Precision Survey and Alignment of Upcoming Large Linear Accelerators  

    S. Takahasi: Periodic Seasonal Variation of Magnets Level of the STB Ring  

    --return to top--

    Appendix

    D. L. Kubik: Development of Photogrammetric Methods of Stress Analysis and Quality Control  

    J. A. Greenwood: CDF Central Detector Installation : an Efficient Merge of Digital Photogrammetry and Laser Tracker Metrology  

    G. J. Wojcik: Laser Tracker, a Handy Tool for Metrology and Alignment  

    M. Mayoud: Conclusive Remarks  

    --return to top--

    Search SPIRES for papers from this conference:

    Author:
    Title:
    ePrint arXiv:

     

    --return to top--

    Last updated September 13, 2005