Abstracts |
J. Chiba, H. Fujii, K. Furukawa, N. Kamikubota, H. Nakagawa, N. Yamamoto (KEK), H. Sakaki, H. Yoshikawa (JAERI)
Recently, Phase 1 of the Joint Project between JAERI and KEK on high-intensity proton accelerators has been approved for construction. Phase 1 includes 1) 400 MeV Linac, 2) 3 GeV Proton Synchrotron (PS) at 1 MW, 3) 50 GeV PS at 0.75 MW, 4) major part of the3 GeV neutron/meson facility, and 5) a portion of the 50 GeV experimental facility. We are making an overall design of the control system for the Project in terms of the following 5 components, 1) network, 2) equipment handling, 3) operator interface, 4) operation/simulation servers, and 5) database servers. A preliminary conceptual design will be given. As discussed before [1] we are going to use the EPICS for the control of equipments. EPICS device support for the TCP(UDP)/IP devices such as WE7000 measurement stations and PLC's are now being developed. Details on this issue is written in Ref. [2].
[1] J. Chiba et al., A Control System of the JHF Accelerator Complex, Proc. of ICALEPCS99 p672.
[2] K. Furukawa et al., contribution to this Conference.
eCONF
C011127
ePROCEEDINGS
COMMITTEES
PARTICIPANTS
PROGRAM
SUMMARY
ICALEPCS 2001
eCONF
|
||
Last updated: September 13, 2002 Website Problem? Contact Technical Publications |