PEP-II I.R. Engineering and Physics Meeting
Minutes of Past Meetings
All minutes are text or html files readable/print-able with your browser, or download-able for viewing with a word processor or editor.
1997 Calendar Year Meeting Minutes
1996 Calendar Year Meeting Minutes
- 6 Dec 96 Minutes (html): Q2Forward Shielding Plug Summary (Ecklund)
- 22 Nov 96 Minutes (html): Q1/Q2Harmonic Correction Ring Review (Humphries); Near IR HOM Analysis Update (Lin)
- 15 Nov 96 Minutes (html): Q2and Stray Solenoid Fields Magnetic Analysis (Mikhailov)
- 8 Nov 96 Minutes (html): Q1Prototype Results (Sullivan); B1 Magnet Design (Ringwall); B1Chamber Design (Skarpaas)
- 25 Oct 96 Minutes (html): NearIR H.O.M. Analysis (Lin); Q2 Plug/Raft (Debarger, Keller); SK1and Q2 H.C.R. Analysis (Humphries)
- 18 Oct 96 Minutes (html): Q2Plug Fabrication (Keller); Q2 Raft Layout (Debarger); Q2 3-D Analysis(Osborn)
- 11 Oct 96 Minutes (html): Q2Bucking Solenoid Layout (Debarger); Q2 3-D Analysis (Osborn);Near IR H.O.M. Analysis (Lin); HER Quad Solenoid Tests (Ecklund)
- 4 Oct 96 Minutes (html): Q2Shielding Plug (Keller); Raft Update (Debarger); IR-2 Pier Review(Kaul, Nordby, Krebs)
- 27 Sep 96 Minutes (html): Q2Shielding Plug (Krebs, Nordby, Fackler); Q2 Magnet Position (Debarger);Q1 Prototype (Ringwall, Ecklund)
- 20 Sep 96 Minutes (html): Q2Shielding Plug Update (Krebs, Osborn); Q2/4/5 Raft Update (Debarger)
- 13 Sep 96 Minutes (html): Vertex Vacuum Chamber Design Update (Skarpaas), Near IR Cooling (Nordby),SVT Cooling (Kerth), Q2 Magnet Update (Osborn)
- 6 Sep 96 Minutes (html): Fieldsin Q2 (Seeman), Comments on Q2 3-D Analysis (Ecklund), BaBar Magnetic Analysis (Fackler)
- 30 Aug 96 Minutes (html): B1-Q5BSC/Magnet Positions (Sullivan), Q2 Stray Fields (Seeman), Vertex Vacuum Chamber Design (Skarpaas)
- 23 Aug 96 Minutes (html): Q2/4/5Raft Analysis (Debarger), Q2 Plug (Hadjena), Raft Pier (Nordby), Platforms (Krebs), Phase I HER I.R. (Nordby)
- 9 Aug 96 Minutes (html): Q2/4/5Raft Update (Debarger), Raft Pier and IR Hall Layout (Nordby)
- 26 July 96 Minutes (html): IR Magnets Final Config (Sullivan), Q1 Trims Final Config. (Ecklund)
- 12 July 96 Minutes (html): IronSK1 Update (Younger), B1/Q1 Magnet Update (Sullivan)
- 21 June 96 Minutes (txt): IronSK1 Update, Radiation Dose Clac's for B1 and Q1, Radiation Testing NdFeB
- 14 June 96 Minutes (txt): Investigation into Using NdFeB for B1 and Q1 and Impact on Their Design
- 17 May 96 Minutes (txt): BackEnd Q2/4/5 Raft and Space Update, Forward End Q2/4/5 Raft Update
- 10 May 96 Minutes (txt): Q2/Q4Region, Q1 Correction by Block Moving, Q1 Trims, Q1 Thermal Shield
- 3 May 96 Minutes (txt): B1/Q1Ion Pump Design, Near IR Pressure Profile, Detector Backgrounds Discussion
- 26 Apr 96 Minutes (txt): ForwardQ2/4/5 Raft Design, Backward Q2/4/5 Raft Design, Space in S.O.B.,D.C. Cables
- 22 Mar 96 Minutes (txt): P.M./IronQuad Test Results, Iron Q2 Update, B1/Q1 Harmonics, P.M. Q2 Shielding
- 15 Mar 96 Minutes (txt): P.M./IronQuad Test Results, P.M. Q2 HEB Shielding Design, Iron Q2 Update
- 8 Mar 96 Minutes (txt): Frangible Link Design, Iron Q2 with New BSC's, Q1 Trims Update
- 1 Mar 96 Minutes (txt): IR Envelopes, Radiation Monitoring, Q2 LEB Chamber Thermal Analysis
- 23 Feb 96 Minutes (txt): Solenoid Field Harmonics, Q2 Septum Magnet, Q1 Field Map, Trip to UGIMAG
- 16 Feb 96 Minutes (txt): Q1Dipole Radial Fields, Q2 Shielding, Radiation Monitors
- 9 Feb 96 Minutes (txt): Q2 Magnetic Analysis, Q2 Design Update
- 2 Feb 96 Minutes (txt): Q2LEB Chamber, Q2 HEB Shielding
- 26 Jan 96 Minutes (txt): ForwardRaft Base Footprint, Q2 LEB Chamber, Solenoid Effect on Q2 HEB Shield
- 19 Jan 96 Minutes (txt): Q1Status, Shimming, Harmonics; Q2 Status, Tolerance Analysis
- 12 Jan 96 Minutes (txt): Energy Asymmetry Study, Q2 Shielding for the H.E.B., Q2 Mechanical Envelope
- 5 Jan 96 Minutes (txt): Q1Permanent Magnet Material Preliminary Test Results
1995 Calendar Year Meeting Minutes
- 22 Dec 95 Minutes (txt): ForwardEnd Layout, Q2 Septum Chamber, Q2 P.M. Shielding, P.M. Temp Effects
- 15 Dec 95 Minutes (txt): Q2Mini Design Review: Septum, P.M. Options; Optics of Moving Q2
- 8 Dec 95 Minutes (txt): Base-IsolatedDetector Motions, Q2 Harmonic Correction Method, Q1 Correction Estimate
- 17 Nov 95 Minutes (txt): Forward End Small Radius Issues, Q1 Trim Coil Design, Q2/SK1 Design Update
- 10 Nov 95 Minutes (txt): Beam Pick-up in D.C., Q1 Magnetic Analysis, Q1 Ass'y Plan, Q2 Update
- 3 Nov 95 Near IR Engin & Physics Mtg: txt
- 27 Oct 95 Near IR Engin & Physics Mtg: txt
- 13 Oct 95 Near IR Engin & Physics Mtg: txt
- 29 Sep 95 Near IR Engin & Physics Mtg: txt
- 15 Sep 95 Near IR Engin & Physics Mtg: txt
- 1 Sep 95 Near IR Engin & Physics Mtg: txt
- 25 Aug 95 Near IR Engin & Physics Mtg: txt
- 18 Aug 95 Near IR Engin & Physics Mtg: txt
[IR Home][PEP-II][BaBar][SLAC]
For comments / questions about the Near I.R. WWWpages, contact
nordby@slac.stanford.edu