| TIME |
TITLE OF TALK |
SPEAKER |
| PART I: PRODUCTION AND FABRICATION |
| 8:30-9:00 |
Committee Closed Session(pdf) (ppt) |
| 9:00-9:05 |
Introduction(pdf)(ppt) |
W. Wisniewski |
| 9:05-9:25 |
LST Production and Assembly(pdf)(ppt) |
A. J. S. Smith |
| 9:25-9:30 |
Brass Absorber Production(pdf) (ppt) |
J. Krebs |
| 9:30-9:40 |
LST Gas System(pdf)(ppt) |
R. Messner |
| 9:40-10:00 |
Racks, Crate and Cableways(pdf)(ppt) |
P. Kim |
| 10:00-10:15 |
Break |
|
| PART II: INSTALLATION |
| 10:15-10:30 |
LST High Voltage System (pdf) (ppt) |
K. Honscheid |
| 10:30-10:45 |
Z Strip Production(pdf)(ppt) |
R. Schindler |
| 10:45-11:00 |
LST Storage and Testing(pdf)(ppt) |
C. Hast |
| 11:00-11:30 |
LST Installation, Connection and Checkout(pdf) (ppt) |
W. Sands |
| 11:30-11:40 |
IR-2 Installation Manpower and Organization Chart(pdf)(ppt) |
J. Krebs |
| 11:40-12:00 |
Hazard Analysis and Safety Oversight(pdf)(ppt) |
F. O'Neill |
| 12:00-13:00 |
Lunch |
|
| 13:00-13:45 |
Mechanical Installation Preparation(pdf)(ppt) |
J. Krebs |
| 13:45-14:30 |
2004 IR-2 Installation Schedule(pdf) (ppt) |
J. Krebs |
| 14:30-15:00 |
Review Committee Meeting |
|
| 15:00-16:00 |
Breakout Session |
|
| 16:00-16:30 |
Closeout Meeting |
|