SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Org. Search
Who's who?
Meetings
BaBar Calendar
2008: [pdf]
2007: [pdf]
2006: [pdf]
Archive
Collaboration
Spokesperson
Collab Meetings
Workshops
Collaborators
Collab Council
Institutions
Institution Pages
Speakers Bureau
Publications Bd.
Technical Board
ATB Augmented Technical Board
Technical Coord.
Short Term
Long-Term Task Force
PubDB: public, collaborator
Information
Joining BaBar
Working at SLAC
Stanford Guest House
Hotels (map) and Transport
New user info.
Pub. pol. [pdf,ps]
Submitting Talks
Web guidelines
Safety & Compliance Reference
E, S, & H
BFMAIL
Hypernews
Employment
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

Hoisting & Rigging Procedures for IR-2

Hoisting and rigging in IR-2 is strictly to be conducted by professional riggers with the authorization of the BABAR Chief Engineer, J.Krebs, and the BABAR Technical Coordinator, W.Wisniewski.

Number System Description Person
AP-350-990-00 Forward Calorimeter Procedure for Withdrawal and Reinstallation S.Metcalfe
AP-350-990-01 BABAR Detector Procedure for Vertical Position Adjustment J.Krebs
AP-350-990-02 BABAR Detector Procedure for Yaw Adjustment J.Krebs
AP-350-990-03 Forward End Doors Procedure for Opening and Closing J.Krebs
AP-350-990-04 Backward End Doors Procedure for Opening and Closing J.Krebs
AP-350-990-05 Backward End Plug Procedure for Removal and Reinsertion J.Krebs
AP-350-990-06 Flux Return Procedure for Removal/Installation of FWD Lower Corner Blocks J.Krebs
AP-350-990-07 Flux Return Procedure for Removal/Installation of FWD Upper Corner Blocks J.Krebs
AP-350-990-08 Flux Return Procedure for Removal/Installation of FWD Upper Center Gap Plate J.Krebs
AP-350-990-09 Flux Return Procedure for Removal/Installation of FWD Lower Center Gap Plate J.Krebs
AP-350-990-10 Flux Return Procedure for Removal/Installation of FWD Lower Flux Bar J.Krebs
AP-350-990-11 Flux Return Procedure for Removal/Installation of FWD Upper Flux Bar J.Krebs
AP-350-990-12 Flux Return Procedure for Removal/Installation of Side Gap Plates J.Krebs
AP-350-990-13 Flux Return Procedure for Removal/Installation of FWD Lower Corner Block Adaptor J.Krebs
AP-350-990-14 Flux Return Procedure for Removal/Installation of FWD Solenoid Support Arm J.Krebs
AP-350-990-15 Flux Return Procedure for Removal/Installation of BWD Lower Corner Blocks J.Krebs
AP-350-990-16 Flux Return Procedure for Unbolting/Bolting Barrel Corner Blocks L.Dittert
AP-350-990-17 General IR-2 Checklist for Overhead 50 Ton Bridge Crane J.Krebs