Hoisting and rigging in IR-2 is strictly to be conducted by
professional riggers with the authorization of the BABAR Chief Engineer, J.Krebs,
and the BABAR Technical Coordinator, W.Wisniewski.
| Number |
System |
Description |
Person |
| AP-350-990-00 |
Forward Calorimeter |
Procedure for Withdrawal and Reinstallation |
S.Metcalfe |
| AP-350-990-01 |
BABAR Detector |
Procedure for Vertical Position Adjustment |
J.Krebs |
| AP-350-990-02 |
BABAR Detector |
Procedure for Yaw Adjustment |
J.Krebs |
| AP-350-990-03 |
Forward End Doors |
Procedure for Opening and Closing |
J.Krebs |
| AP-350-990-04 |
Backward End Doors |
Procedure for Opening and Closing |
J.Krebs |
| AP-350-990-05 |
Backward End Plug |
Procedure for Removal and Reinsertion |
J.Krebs |
| AP-350-990-06 |
Flux Return |
Procedure for Removal/Installation of FWD Lower Corner Blocks |
J.Krebs |
| AP-350-990-07 |
Flux Return |
Procedure for Removal/Installation of FWD Upper Corner Blocks |
J.Krebs |
| AP-350-990-08 |
Flux Return |
Procedure for Removal/Installation of FWD Upper Center Gap Plate |
J.Krebs |
| AP-350-990-09 |
Flux Return |
Procedure for Removal/Installation of FWD Lower Center Gap Plate |
J.Krebs |
| AP-350-990-10 |
Flux Return |
Procedure for Removal/Installation of FWD Lower Flux Bar |
J.Krebs |
| AP-350-990-11 |
Flux Return |
Procedure for Removal/Installation of FWD Upper Flux Bar |
J.Krebs |
| AP-350-990-12 |
Flux Return |
Procedure for Removal/Installation of Side Gap Plates |
J.Krebs |
| AP-350-990-13 |
Flux Return |
Procedure for Removal/Installation of FWD Lower Corner Block Adaptor |
J.Krebs |
| AP-350-990-14 |
Flux Return |
Procedure for Removal/Installation of FWD Solenoid Support Arm |
J.Krebs |
| AP-350-990-15 |
Flux Return |
Procedure for Removal/Installation of BWD Lower Corner Blocks |
J.Krebs |
| AP-350-990-16 |
Flux Return |
Procedure for Unbolting/Bolting Barrel Corner Blocks |
L.Dittert |
| AP-350-990-17 |
General IR-2 |
Checklist for Overhead 50 Ton Bridge Crane |
J.Krebs |