TSFi/TSF GLINK scope test May/6/03

TSFi GLINK output Test points:

Note: there is a mistake in TSFi test point labels. TP7 (TP8) is actually CAV* (DAV*) while the board label had these two swapped. Normal condition with DCH fiber connected:

Disconnected DCH fiber:

New/Old TSFi Comparison:

New TSFi in DCH/DCT TSF crate
Old TSFi in ZPD test crate
Use old TSF on the receiving side in both cases, and the input is from the DCH fiber via splitter to both. Examine the CAV*,DAV*,STRBOUT signals as seen on the old TSF main board: Some of the DC levels for new TSFi traces below are shifted because of some connection/probe anomaly. Test later again showed that the DC levels for the new TSFi are the same as old TSFi.

CAV* signal:

DAV* signal:

STRBOUT signal: