DCT Upgrade Interface/GLT/astructure Updated Aug/19/03 ==================================== TSFi Jul Aug Sep ---- 21 28 4 11 18 25 1 8 15 MTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSM 1a) Pre-prod tests ******* D (Neighbor, LED issue, timing stability, LVDS pwrdown/keep alive,slowmon) 1b) Pre-prod systematic tests 2) TSFi part order ******S********** 3) LVDS cable order **************S******* 4) TSFi PCB fab. *******S******* 5) TSFi assembly ******** 6) TSFi front panel ***S****************** 7) Production testing ************* ZPDi Jul Aug Sep ---- 21 28 4 11 18 25 1 8 15 MTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSM 1) TSF->ZPD test ********************D 2) ZPD->GLT test ***************D 3) ZPDi part orders *****S************ 4) ZPDi assembly *******S******* 5) ZPDi testing ******** 6) ZPDi front-panel *******************S********** BLT/GLT/GLTi ------------ 1) BLT/GLT FC update ************ 2) BLT FC/algorithm test ****************** 3) GLT line study ******************** 4) GLT MC firmware *************** 5) GLT board test ******************* 6) GLT new FEX ********************************** 7) GLT output mem fix ***************** 8) GLTi test ********************** 9) GLTi PCB Fab *************** 10) GLTi assembly ********** 11) GLTi tests ********** 12) EMT->GLT *D ** 1 ** 13) GLTi panel ****************** Miscellaneous ------------- Bring one crate back to testlab ? Done ZPD->GLT, TSF->BLT, BLT->GLT cables remake with twisted flat ? BLT/GLT MC needed to produce board test data. TrgConfig code update for new ZPD triggers.