SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Det. Search
Who's who?
Meetings
FAQ
Images
Archive
Systems
Performance
Intern. region
Vertex Tracker
Drift chamber
DIRC
Calorimeter
IFR
LST
Magnet
Electronics
Trigger
Operations
Run Coordination
Contact Experts
Shift Takers Info
Operations Manual
Electronic Logbook
Ops Hypernews
Shift Signup
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

L1 Drift Chamber Trigger Upgrade Conceptual Design Review


Back to Trigger home page

Review Date/location:

    September 11, 2001 / SLAC Orange Room

Review Committee and charge

Record of Review Committee Comments

Agenda

Presentations:

  • Overview and Interface (Su Dong) [pdf]
  • TSF Upgrade (Scott Kolya) [ppt],[pdf]
  • ZPD Design Overview (Stephen Bailey): [ppt],[pdf]
  • ZPD Pattern Recognition Algorithm (Nick Sinev): [pdf]
  • ZPD Fitter Algorithm (Masahiro Morii) [ppt],[pdf]
  • ZPD Algorithm Performance (Valerie Halyo): [ppt],[pdf]
  • ZPD Engineering Issues (John Oliver) [pdf] ZPD Schedule [pdf]
  • Manpower, Cost, Schedule (Masahiro Morii): [ppt],[pdf]

Documentations:

Backup Documentations:

Background Material:


  • List of review materials needed for the original PDRR+CDR and PDR at BaBar Construction Phase
    Andy Lankford, December 14, 1995



  • For comments and suggestions, please send e-mail to sudong@slac.stanford.edu