|
|
L1 Drift Chamber Trigger Upgrade Conceptual Design Review
Back to Trigger home page
Review Date/location:
September 11, 2001 / SLAC Orange Room
Agenda
Presentations:
- Overview and Interface (Su Dong) [pdf]
- TSF Upgrade (Scott Kolya) [ppt],[pdf]
- ZPD Design Overview (Stephen Bailey): [ppt],[pdf]
- ZPD Pattern Recognition Algorithm (Nick Sinev): [pdf]
- ZPD Fitter Algorithm (Masahiro Morii) [ppt],[pdf]
- ZPD Algorithm Performance (Valerie Halyo): [ppt],[pdf]
- ZPD Engineering Issues (John Oliver)
[pdf]
ZPD Schedule [pdf]
- Manpower, Cost, Schedule (Masahiro Morii): [ppt],[pdf]
Documentations:
Backup Documentations:
Background Material:
List of review materials needed for the original PDRR+CDR and PDR at BaBar Construction Phase Andy Lankford, December 14, 1995
For comments and suggestions, please send e-mail to sudong@slac.stanford.edu
|
|