SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Det. Search
Who's who?
Meetings
FAQ
Images
Archive
Systems
Performance
Intern. region
Vertex Tracker
Drift chamber
DIRC
Calorimeter
IFR
LST
Magnet
Electronics
Trigger
Operations
Run Coordination
Contact Experts
Shift Takers Info
Operations Manual
Electronic Logbook
Ops Hypernews
Shift Signup
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

L1 IFR Trigger



IFT Design Documentations

  • IFS schematics, board layout and components
  • IFT tutorial
  • Documentation for IFT since LST was installed:
    • Proposed solution for time delay from Paolo Musico and Saverio Minutoli
    • (Jan.25, 2005)
    • The IFS firmware was modified and uploaded to resolve the timing split between RPC and LST due to the delay in LST (March 2005). This link to the directory containing the new firmware information, but first read the README file.
    • The IFT delays can be adjusted with jumpers following this guideline.
    • LST was installed for sextants 0,2,3,5 by Dec.2006 and IFT timing was aligned in Jan.2007 before the run 6 data-taking.

Selina Li