|
|
Trigger Links
Trigger Component Design Reviews
- PDRR for TRG, CDR for L1T (February 27, 1996)
- PDR for DCT (July 14, 1997)
- CDR for L3T (August 11, 1997)
- PDR for EMT+GLT (November 10, 1997)
- CDR+PDR for IFT (December 15, 1997)
- PDR for Level 3 Trigger (May 15, 1998)
- FDR for EM Calorimeter Trigger (EMT) (June 18, 1998)
- FDR for Drift Chamber Trigger (DCT) (August 7, 1998)
- FDR for Global Trigger (GLT) (September 29, 1998)
Detailed Documentation and Archives
Internal Hardware Documents by date (latest first)
- SVT Latency change (18 May 1998)
- DCT IEEE hardware papers - (as submitted November 1998) [Abstracts] (April
17, 1998)
- Global Trigger Line Dictionary (resurrected) (December 1997)
-
BaBar Note #380 Design and Simulated Performance of the Level 1 Trigger System, updated Master's thesis of Stefan Gehrig (July,1997)
- Detailed Rate calculations for BaBar Note #380 (S. Gehrig, June 6, 1997)
- Latency and Jitter Specifications and Related Material (directory, created September 8, 1996)
- CLEO/BELLE/BaBar Comparison Summary (April 16, 1996)
- Trigger Group Scope (June 8, 1995, text)
- Level 1 Trigger Electronics: TDR Cost Model (March 25, 1995, postscript, 240Kb)
Mandeep S. Gill
Last modified: Wed Sep 1 16:36:10 PDT 1999
|
|